My Shopping Cart My Downloads
Search the CII Store:  
 


1.04 - Construction Input in Front End Planning


Items 1 - 6 of 6

Page: 1

 

IR241-2
Construction Input Assessment Tool, Version 1.1
New Publication
Details/Purchase
View Abstract
Members: FREE
Non-Members: $ 205.53

Description
This newly updated Implementation Resource comes with a set of instructions and two Excel®-based tools. It provides project stakeholders a means of determining project activities that require construction input during front end planning and whether those resources are available in-house or need to be brought onboard. This publication was developed to support the CII Front End Planning Best Practice and it specifically addresses interfaces with the Project Definition Rating Indices (PDRI) for Buildings and Industrial Projects.

Web download only


EM241-21
Construction Input Assessment in Front End Planning – Instructor’s Guide
New Publication
Details/Purchase
View Abstract
Members: $ 109.00
Non-Members: $ 439.00

Description
Many projects do not include adequate construction input during front end planning (FEP), resulting in projects falling short of their goals. Historically the primary stakeholders in a project (i.e. owners, designers, and constructors) are not aligned and tend to operate in their own domains. As a result the needed collaboration is not obtained and projects do not achieve the level of success that is possible.

CII has developed an Excel®-based decision aid—Construction Input Assessment Tool (CIAT)—to help get construction input at the right time and level of effort during FEP. CIAT provides project stakeholders with a means of determining project items and activities that require construction input during front end planning. It also will assist in evaluating if adequate construction expertise is available or if outside sources are needed.

This education module provides the venue for teaching the background of the tool, how, when and with whom to employ it, and provides an opportunity to use the tool in hypothetical situations.

Education modules are not available for download from the Internet.

This publication contains:

  • PowerPoint® presentation files
  • IR241-2, Construction Input Assessment Tool (CIAT), Version 1.1


EM241-21A
Construction Input Assessment in Front End Planning – Participant Handbook
New Publication
Details/Purchase
View Abstract
Members: $ 65.00
Non-Members: $ 259.00

Description
Many projects do not include adequate construction input during front end planning (FEP), resulting in projects falling short of their goals. Historically the primary stakeholders in a project (i.e. owners, designers, and constructors) are not aligned and tend to operate in their own domains. As a result the needed collaboration is not obtained and projects do not achieve the level of success that is possible.

CII has developed an Excel®-based decision aid—Construction Input Assessment Tool (CIAT)—to help get construction input at the right time and level of effort during FEP. CIAT provides project stakeholders with a means of determining project items and activities that require construction input during front end planning. It also will assist in evaluating if adequate construction expertise is available or if outside sources are needed.

This education module provides the venue for teaching the background of the tool, how, when and with whom to employ it, and provides an opportunity to use the tool in hypothetical situations.

Education modules are not available for download from the Internet.

This publication contains IR241-2, Construction Input Assessment Tool (CIAT), Version 1.1


EM241-21K
Construction Input Assessment in Front End Planning – Classroom Kit
New Publication
Details/Purchase
View Abstract
Members: $ 429.00
Non-Members: $1,699.00

Description
Combines one Instructor’s Guide (EM241-21) and six Participant Handbooks (EM241-21A). Volume discounts may apply.


RS241-1
Optimizing Construction Input in Front End Planning
Details/Purchase
View Abstract
Members: $ 9.86
Non-Members: $ 39.45

Description
Project success often depends on the timing and nature of early construction input in the front end planning process. Unlike constructability, however, the tactic described here is prior to the design phase. Describes an Excel®-based tool, the Construction Input Assessment Tool, which provides stakeholders a means of determining project activities that require construction input during front end planning and whether those resources are available in-house or need to be brought onboard.


RR241-11
Optimizing Construction Input in Front End Planning
Details/Purchase
View Abstract
Members: FREE
Non-Members: $ 194.82

Description
Gokhale, Vanderbilt Univ.; Hastak, Purdue Univ.; Oh, Purdue Univ.



Items 1 - 6 of 6

Page: 1

 




Select a product
IR241-2
EM241-21
EM241-21A
EM241-21K
RS241-1
RR241-11
1

Knowledge Areas
00 - General CII Information
01 - Project Planning
02 - Design Optimization
03 - Procurement and Materials Management
04 - Construction - Other
05 - Facility Startup and Operations
06 - Human Resources Management
07 - Project Organization and Management
08 - Business and Project Processes
09 - Project Controls
10 - Risk Management
11 - Safety, Health, and Environment
12 - Information Management and Technology Systems
13 - Globalization Issues
14 - Security
PIP

 
© 2010 Construction Industry Institute™ All rights reserved.   |   Privacy Policy
Cockrell School of Engineering