You have no purchased products available for download.
| Product Code | Title | Downloads |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 3674 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 1654 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 216 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 130 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 121 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 110 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 81 |
| IR213-3 | Front End Planning Process, Version 2.0 | 79 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 79 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 78 |
| SP39-2 | Pre-Project Planning Handbook | 78 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 75 |
| RS143-1 | Craft Labor Productivity | 74 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 73 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 73 |
| SP39-2 | Pre-Project Planning Handbook | 72 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 70 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 70 |
| IR121-2 | Planning for Startup | 69 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 68 |
| IR213-3 | Front End Planning Process, Version 2.0 | 67 |
| RS6-1 | Project Control for Engineering | 67 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 67 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 66 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 64 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 62 |
| SP43-1 | Project Change Management | 61 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 61 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 60 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 59 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 57 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 57 |
| RS3-1 | Constructability: A Primer | 57 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 57 |
| IR161-2 | Small Projects Toolkit | 56 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 55 |
| IR213-3 | Front End Planning Process, Version 2.0 | 55 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 55 |
| RS6-1 | Project Control for Engineering | 55 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 54 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 54 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 53 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 53 |
| RS6-5 | Project Control for Construction | 53 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 53 |
| RS34-2 | Preview of Constructability Implementation | 52 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 52 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 52 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 51 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 51 |
| IR121-2 | Planning for Startup | 50 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 50 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 50 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 50 |
| IR161-2 | Small Projects Toolkit | 49 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 49 |
| RS112-1 | 2% Engineering Can It Work for You? | 49 |
| RS6-5 | Project Control for Construction | 48 |
| SP43-1 | Project Change Management | 47 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 47 |
| SP39-2 | Pre-Project Planning Handbook | 47 |
| SD-99 | The Effects of Change on Labor Productivity: Why and How Much | 47 |
| RS6-6 | Work Packaging for Project Control | 47 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 47 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 46 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 46 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 45 |
| RS6-1 | Project Control for Engineering | 45 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 45 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 45 |
| IR213-3 | Front End Planning Process, Version 2.0 | 44 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 44 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 43 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 43 |
| RR106-11 | An Analysis of the Impacts of Using Three-Dimensional Computer Models in the Management of Construction | 43 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 43 |
| IR203-2 | Zero Field Rework Self-Assessment Opportunity Checklist | 43 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 43 |
| RS112-1 | 2% Engineering Can It Work for You? | 42 |
| RS161-1 | Small Project Execution | 42 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 41 |
| RS41-1 | Schedule Reduction | 41 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 40 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 40 |
| SP31-1 | Implementing TQM in Engineering & Construction | 40 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 40 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 40 |
| IR134-2 | Tools for Effective Project Team Leadership | 40 |
| SD-12 | Project Control in Design Engineering | 39 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 39 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 39 |
| IR121-2 | Planning for Startup | 38 |
| RS156-1 | Engineering Productivity Measurement | 38 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 38 |
| SP39-2 | Pre-Project Planning Handbook | 38 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 38 |
| SP39-2 | Pre-Project Planning Handbook | 38 |
| SD-4 | Constructability Improvement During Conceptual Planning | 37 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 37 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 36 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 36 |
| RS191-1 | Lean Principles in Construction | 36 |
| RS6-7 | Concepts and Methods of Schedule Compression | 36 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 36 |
| IR121-2 | Planning for Startup | 36 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 36 |
| RS156-1 | Engineering Productivity Measurement | 36 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 36 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 36 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 35 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 35 |
| RS8-1 | Evaluation of Design Effectiveness | 35 |
| IR192-2 | Engineering Productivity Measurement System | 35 |
| RS161-1 | Small Project Execution | 35 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 35 |
| RS2-3 | Productivity Measurement: An Introduction | 34 |
| RS6-3 | Model Planning and Controlling System for EPC of Industrial Projects | 34 |
| RS8-1 | Evaluation of Design Effectiveness | 34 |
| SD-79 | Quality Performance Measurements of the EPC Process: Current Practices | 34 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 33 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 33 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 33 |
| RS101-1 | Design for Safety | 33 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 33 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 33 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 33 |
| SP13 | Manual for Small (Special) Project Management | 33 |
| SD-28 | Work Packaging for Project Control | 33 |
| SD-41 | Risk Management in Capital Projects | 33 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 33 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 33 |
| RS234-1 | Lean Implementation at the Project Level | 33 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 33 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 33 |
| RS158-1 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 33 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 32 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 32 |
| IR102-2 | Partnering ToolKit (binder not included) | 32 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 32 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 32 |
| IR121-2 | Planning for Startup | 32 |
| SP39-2 | Pre-Project Planning Handbook | 32 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 32 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 31 |
| IR142-2 | Design for Maintainability Guidebook | 31 |
| RS8-2 | Input Variables Impacting Design Effectiveness | 31 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 31 |
| SP43-1 | Project Change Management | 31 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 31 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 31 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 31 |
| SD-85 | Constructability: Program Assessment and Barriers to Implementation | 31 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 31 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 31 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 31 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 30 |
| RS6-1 | Project Control for Engineering | 30 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 30 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 30 |
| RS134-1 | Identifying Success Factors for High Performance Project Teams | 30 |
| RR143-11 | Determinants of Jobsite Productivity | 30 |
| IR204-2 | Project Priority Calculator | 30 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 30 |
| SP43-1 | Project Change Management | 30 |
| SD-72 | Computerized Decision Support for Modularization of Industrial Construction | 30 |
| RS6-6 | Work Packaging for Project Control | 30 |
| IR121-2 | Planning for Startup | 29 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 29 |
| RS112-1 | 2% Engineering Can It Work for You? | 29 |
| RS165-1 | Owner’s Tool for Project Delivery and Contract Strategy Selection | 29 |
| IR181-2 | International Project Risk Assessment (IPRA) | 29 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 29 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 29 |
| RS7-2 | Project Materials Management Primer | 29 |
| SD-103 | Quality Performance Measurements of the EPC Process: The Blueprint | 29 |
| SP39-2 | Pre-Project Planning Handbook | 29 |
| RR143-11 | Determinants of Jobsite Productivity | 29 |
| SD-108 | Quantitative Impacts of Project Change | 29 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 29 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 29 |
| RS114-1 | Innovative Contractor Compensation | 29 |
| RS135-1 | Attracting and Maintaining a Skilled Construction Work Force | 28 |
| IR121-2 | Planning for Startup | 28 |
| RS214-1 | Trade-Off between Cost and Schedule | 28 |
| RS32-1 | Zero Injury Techniques | 28 |
| IR140-2 | Employee-Based Project Incentives Toolkit | 28 |
| RS220-1 | Leading Indicators during Project Execution | 28 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 28 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 28 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 28 |
| RR234-11 | Roadmap for Lean Implementation at the Project Level | 28 |
| RS5-1 | Impact of Various Construction Contract Types and Clauses on Project Performance | 28 |
| RS34-2 | Preview of Constructability Implementation | 28 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 28 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 28 |
| IR121-2 | Planning for Startup | 28 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 28 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 28 |
| RR185-11 | The Effectiveness of Innovative Crew Scheduling Techniques | 28 |
| RS3-1 | Constructability: A Primer | 28 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 27 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 27 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 27 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 27 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 27 |
| SP13 | Manual for Small (Special) Project Management | 27 |
| SP23-3 | Disputes Potential Index | 27 |
| RS220-1 | Leading Indicators during Project Execution | 27 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 27 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 27 |
| IR213-3 | Front End Planning Process, Version 2.0 | 27 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 27 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 27 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 27 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 27 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 27 |
| SP39-2 | Pre-Project Planning Handbook | 27 |
| RS121-1 | Planning for Startup: Overview of Research | 27 |
| RS123-1 | Modeling the Lessons Learned Process | 26 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 26 |
| IR142-2 | Design for Maintainability Guidebook | 26 |
| RR143-11 | Determinants of Jobsite Productivity | 26 |
| SP39-2 | Pre-Project Planning Handbook | 26 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 26 |
| RS234-1 | Lean Implementation at the Project Level | 26 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 26 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 26 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 26 |
| IR213-3 | Front End Planning Process, Version 2.0 | 26 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 26 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 26 |
| SD-108 | Quantitative Impacts of Project Change | 26 |
| IR181-2 | International Project Risk Assessment (IPRA) | 26 |
| SP43-1 | Project Change Management | 26 |
| IR200-2 | The Future Starts Now: Recommendations for Recruiting and Retaining Future Engineering and Construction Leaders | 26 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 25 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 25 |
| SD-99 | The Effects of Change on Labor Productivity: Why and How Much | 25 |
| IR230-2 | Implementation of Lessons Learned Programs | 25 |
| RS156-1 | Engineering Productivity Measurement | 25 |
| RS43-2 | Quantitative Effects of Project Change | 25 |
| IR204-2 | Project Priority Calculator | 25 |
| RS123-1 | Modeling the Lessons Learned Process | 25 |
| RR130-11 | PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships | 25 |
| RR213-11 | Data Analysis in Support of Front End Planning Implementation | 25 |
| SP32-2 | Zero Injury Economics | 25 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 25 |
| IR161-2 | Small Projects Toolkit | 25 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 25 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 25 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 25 |
| IR161-2 | Small Projects Toolkit | 25 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 25 |
| RS156-1 | Engineering Productivity Measurement | 25 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 25 |
| SP12-2 | Organizing for Project Success | 25 |
| IR134-2 | Tools for Effective Project Team Leadership | 25 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 25 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 24 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 24 |
| SP43-1 | Project Change Management | 24 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 24 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 24 |
| SD-66 | Construction Changes and Change Orders: Their Magnitude and Impact | 24 |
| RS222-1 | Best Modern Practices for Design in Fast Track Projects | 24 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 24 |
| RS37-1 | Team Building: Improving Project Performance | 24 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 24 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 24 |
| SP43-1 | Project Change Management | 24 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 24 |
| IR213-3 | Front End Planning Process, Version 2.0 | 24 |
| RS8-1 | Evaluation of Design Effectiveness | 24 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 24 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 24 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 24 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 24 |
| RS190-1 | The Owners’ Role in Construction Safety | 24 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 23 |
| RS23-1 | Disputes Prevention and Resolution Techniques in the Construction Industry | 23 |
| RS6-4 | Contractor Planning for Fixed-Price Construction | 23 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 23 |
| RR234-11 | Roadmap for Lean Implementation at the Project Level | 23 |
| SD-28 | Work Packaging for Project Control | 23 |
| SD-92 | Common Commodity Codes | 23 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 23 |
| RS215-1 | Work Force View of Construction Productivity | 23 |
| RS6-3 | Model Planning and Controlling System for EPC of Industrial Projects | 23 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 23 |
| IR181-2 | International Project Risk Assessment (IPRA) | 23 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 23 |
| IR203-2 | Zero Field Rework Self-Assessment Opportunity Checklist | 23 |
| RS220-1 | Leading Indicators during Project Execution | 23 |
| RS10-2 | Measuring the Cost of Quality in Design and Construction | 23 |
| RS101-1 | Design for Safety | 23 |
| SP39-2 | Pre-Project Planning Handbook | 23 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 23 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 23 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 23 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 23 |
| IR210-3 | Equitable Risk Allocation: A Legal Perspective | 22 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 22 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 22 |
| RS19-1 | Allocation of Insurance-Related Risks and Costs on Construction Projects | 22 |
| RS6-1 | Project Control for Engineering | 22 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 22 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 22 |
| IR213-3 | Front End Planning Process, Version 2.0 | 22 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 22 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 22 |
| IR102-2 | Partnering ToolKit (binder not included) | 22 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 22 |
| RS191-1 | Lean Principles in Construction | 22 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 22 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 22 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 22 |
| RS6-3 | Model Planning and Controlling System for EPC of Industrial Projects | 22 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 22 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 22 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 22 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 22 |
| RR124-11 | Re-Engineering the EPC Process | 22 |
| RS6-4 | Contractor Planning for Fixed-Price Construction | 22 |
| IR211-2 | Global Virtual Engineering Team (GVET) Planner | 22 |
| IR210-3 | Equitable Risk Allocation: A Legal Perspective | 22 |
| IR134-2 | Tools for Effective Project Team Leadership | 22 |
| BMM2001-10 | Impacts of Design/Information Technology on Building and Industrial Projects | 22 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 22 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 22 |
| SD-41 | Risk Management in Capital Projects | 22 |
| RR143-11 | Determinants of Jobsite Productivity | 22 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 22 |
| SD-83 | Benefits and Costs of Constructability: Four Case Studies | 22 |
| RS13-1 | Managing Subcontractor Safety | 21 |
| SP32-2 | Zero Injury Economics | 21 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 21 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 21 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 21 |
| RR101-11 | Addressing Construction Worker Safety in the Project Design | 21 |
| RS37-1 | Team Building: Improving Project Performance | 21 |
| RR203-11 | Making Zero Rework A Reality: A Comparison of Zero Accident Methodology to Zero Rework and Quality Management | 21 |
| IR230-2 | Implementation of Lessons Learned Programs | 21 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 21 |
| IR140-2 | Employee-Based Project Incentives Toolkit | 21 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 21 |
| RR143-11 | Determinants of Jobsite Productivity | 21 |
| RR152-11 | Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process for the Management of Construction | 21 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 21 |
| RS41-1 | Schedule Reduction | 21 |
| SD-95 | Dispute Prevention and Resolution | 21 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 21 |
| RR41-11 | An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry | 21 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 21 |
| RS6-7 | Concepts and Methods of Schedule Compression | 21 |
| RS161-1 | Small Project Execution | 21 |
| RS133-1 | Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build | 21 |
| RS185-1 | Effectiveness of Innovative Crew Scheduling | 21 |
| RS190-1 | The Owners’ Role in Construction Safety | 21 |
| SD-12 | Project Control in Design Engineering | 21 |
| SP39-2 | Pre-Project Planning Handbook | 21 |
| RS6-6 | Work Packaging for Project Control | 21 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 20 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 20 |
| IR213-3 | Front End Planning Process, Version 2.0 | 20 |
| IR213-3 | Front End Planning Process, Version 2.0 | 20 |
| RS220-1 | Leading Indicators during Project Execution | 20 |
| RS5-3 | Contract Risk Allocation and Cost Effectiveness | 20 |
| RR102-11 | The Partnering Process Its Benefits, Implementation and Measurement | 20 |
| AR-2006 | CII 2006 Annual Report | 20 |
| IR181-2 | International Project Risk Assessment (IPRA) | 20 |
| RS43-2 | Quantitative Effects of Project Change | 20 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 20 |
| SP39-2 | Pre-Project Planning Handbook | 20 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 20 |
| IR170-2 | Virtual Teams: A Guide to Successful Implementation | 20 |
| IR185-2 | “Look-Up” Table for Crew Scheduling | 20 |
| RS102-1 | Model for Partnering Excellence | 20 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 20 |
| RS185-1 | Effectiveness of Innovative Crew Scheduling | 20 |
| RS101-1 | Design for Safety | 20 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 20 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 20 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 20 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 20 |
| IR181-2 | International Project Risk Assessment (IPRA) | 20 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 20 |
| RS7-2 | Project Materials Management Primer | 20 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 19 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 19 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 19 |
| RR203-11 | Making Zero Rework A Reality: A Comparison of Zero Accident Methodology to Zero Rework and Quality Management | 19 |
| IR121-2 | Planning for Startup | 19 |
| SP13 | Manual for Small (Special) Project Management | 19 |
| IR213-3 | Front End Planning Process, Version 2.0 | 19 |
| IR213-3 | Front End Planning Process, Version 2.0 | 19 |
| IR142-2 | Design for Maintainability Guidebook | 19 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 19 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 19 |
| RS34-2 | Preview of Constructability Implementation | 19 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 19 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 19 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 19 |
| RS143-1 | Craft Labor Productivity | 19 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 19 |
| SP39-2 | Pre-Project Planning Handbook | 19 |
| RS32-1 | Zero Injury Techniques | 19 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 19 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 19 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 19 |
| SP12-2 | Organizing for Project Success | 19 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 19 |
| RR47-13 | Managing Uncertainty in the Piping Process | 19 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 19 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 19 |
| IR246-2 | The Implementation Planning Model: Steps to Success, Version 1.2 | 19 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 19 |
| SD-57 | Data Integration Strategies in Construction | 19 |
| SP43-1 | Project Change Management | 19 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 19 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 19 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 19 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 19 |
| RR158-11 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 19 |
| SD-104 | 3-D Modeling as a Tool to Improve Integrated Design in Construction | 19 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 18 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 18 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 18 |
| SD-12 | Project Control in Design Engineering | 18 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 18 |
| RR123-11 | Modeling the Lessons Learned Process | 18 |
| RS123-1 | Modeling the Lessons Learned Process | 18 |
| RS158-1 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 18 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 18 |
| IR161-2 | Small Projects Toolkit | 18 |
| RS6-1 | Project Control for Engineering | 18 |
| IR170-2 | Virtual Teams: A Guide to Successful Implementation | 18 |
| IR241-2 | Construction Input Assessment Tool, Version 1.1 | 18 |
| RS156-1 | Engineering Productivity Measurement | 18 |
| RS154-1 | Electronic Simulation in Construction | 18 |
| RR124-11 | Re-Engineering the EPC Process | 18 |
| SP31-1 | Implementing TQM in Engineering & Construction | 18 |
| RS215-1 | Work Force View of Construction Productivity | 18 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 18 |
| IR161-2 | Small Projects Toolkit | 18 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 18 |
| SD-12 | Project Control in Design Engineering | 18 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 18 |
| IR121-2 | Planning for Startup | 18 |
| IR230-2 | Implementation of Lessons Learned Programs | 18 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 18 |
| IR142-2 | Design for Maintainability Guidebook | 18 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 18 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 18 |
| RS152-1 | 3D CAD and FIAPP: Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process | 18 |
| SP43-1 | Project Change Management | 18 |
| RS234-1 | Lean Implementation at the Project Level | 18 |
| IR161-2 | Small Projects Toolkit | 18 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 18 |
| RR234-11 | Roadmap for Lean Implementation at the Project Level | 18 |
| RS155-1 | Pre-Project Planning Tool: PDRI for Buildings | 18 |
| RS152-1 | 3D CAD and FIAPP: Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process | 18 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 18 |
| RS182-1 | The Shortage of Skilled Craft Workers in the U.S. | 18 |
| RS161-1 | Small Project Execution | 17 |
| IR181-2 | International Project Risk Assessment (IPRA) | 17 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 17 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 17 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 17 |
| IR142-2 | Design for Maintainability Guidebook | 17 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 17 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 17 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 17 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 17 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 17 |
| RS101-1 | Design for Safety | 17 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 17 |
| RS23-1 | Disputes Prevention and Resolution Techniques in the Construction Industry | 17 |
| RS8-1 | Evaluation of Design Effectiveness | 17 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 17 |
| RR165-12 | Project Delivery and Contract Strategy | 17 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 17 |
| RR156-11 | Engineering Productivity Measurement | 17 |
| RS143-1 | Craft Labor Productivity | 17 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 17 |
| RS230-1 | Effective Management Practices and Technologies for Lessons Learned Programs | 17 |
| RS192-1 | Engineering Productivity Measurements II | 17 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 17 |
| IR213-3 | Front End Planning Process, Version 2.0 | 17 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 17 |
| IR242-2 | Front End Planning of Renovation and Revamp Projects | 17 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 17 |
| IR133-2 | Project Delivery System Selection Workbook | 17 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 17 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 17 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 17 |
| RS12-1 | Project Objective Setting, Second Edition | 17 |
| RS182-1 | The Shortage of Skilled Craft Workers in the U.S. | 17 |
| SD-97 | Adaptation of Quality Function Deployment to Engineering and Construction Project Development | 17 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 17 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 17 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 17 |
| IR170-2 | Virtual Teams: A Guide to Successful Implementation | 17 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 17 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 17 |
| RS143-1 | Craft Labor Productivity | 17 |
| RS32-1 | Zero Injury Techniques | 17 |
| RR156-11 | Engineering Productivity Measurement | 16 |
| RR161-11 | Factors Impacting Small Capital Project Execution | 16 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 16 |
| RR113-11 | Project Definition Rating Index (PDRI) | 16 |
| IR161-2 | Small Projects Toolkit | 16 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 16 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 16 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 16 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 16 |
| RS245-1 | Maximizing Engineering Value | 16 |
| RS6-5 | Project Control for Construction | 16 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 16 |
| RS114-1 | Innovative Contractor Compensation | 16 |
| BMM2008-2 | 2008 Safety Report | 16 |
| IR203-2 | Zero Field Rework Self-Assessment Opportunity Checklist | 16 |
| IR213-3 | Front End Planning Process, Version 2.0 | 16 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 16 |
| IR140-2 | Employee-Based Project Incentives Toolkit | 16 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 16 |
| BMM2001-2 | CII Benchmarking and Metrics 2001 Safety Report | 16 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 16 |
| IR200-2 | The Future Starts Now: Recommendations for Recruiting and Retaining Future Engineering and Construction Leaders | 16 |
| RR112-11 | A Framework and Practices for Cost-Effective Engineering in Capital Projects in the A/E/C Industry | 16 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 16 |
| RR241-11 | Optimizing Construction Input in Front End Planning | 16 |
| RS191-1 | Lean Principles in Construction | 16 |
| RS8-2 | Input Variables Impacting Design Effectiveness | 16 |
| RS121-1 | Planning for Startup: Overview of Research | 16 |
| RS125-1 | Cost and Schedule Impacts of Information Management | 16 |
| RR112-11 | A Framework and Practices for Cost-Effective Engineering in Capital Projects in the A/E/C Industry | 16 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 16 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 16 |
| RS3-1 | Constructability: A Primer | 16 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 16 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 16 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 16 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 16 |
| SD-74 | Guidelines for Implementing TQM in the Engineering and Construction Industry | 16 |
| RS8-1 | Evaluation of Design Effectiveness | 16 |
| RS8-2 | Input Variables Impacting Design Effectiveness | 16 |
| RS6-5 | Project Control for Construction | 16 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 16 |
| RR231-11 | Construction Industry Craft Training in the United States and Canada | 16 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 16 |
| IR241-2 | Construction Input Assessment Tool, Version 1.1 | 16 |
| IR203-2 | Zero Field Rework Self-Assessment Opportunity Checklist | 16 |
| RS7-2 | Project Materials Management Primer | 16 |
| RS7-2 | Project Materials Management Primer | 16 |
| SD-10 | Determining the Impact of Various Construction Contract Types and Clauses on Project Performance, Vol. I: Analysis & Recommendations | 16 |
| SP12-2 | Organizing for Project Success | 16 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 16 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 16 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 16 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 16 |
| RR133-11 | Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build | 16 |
| RS6-5 | Project Control for Construction | 16 |
| RS6-7 | Concepts and Methods of Schedule Compression | 16 |
| RS5-1 | Impact of Various Construction Contract Types and Clauses on Project Performance | 16 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 16 |
| SD-12 | Project Control in Design Engineering | 16 |
| SP14-2 | An Assessment of Education and Training Needs Among Construction Personnel | 16 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 16 |
| RR123-11 | Modeling the Lessons Learned Process | 16 |
| IR241-2 | Construction Input Assessment Tool, Version 1.1 | 16 |
| IR246-2 | The Implementation Planning Model: Steps to Success, Version 1.2 | 16 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 16 |
| IR140-2 | Employee-Based Project Incentives Toolkit | 16 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 16 |
| RS222-1 | Best Modern Practices for Design in Fast Track Projects | 16 |
| RS24-1 | Cost-Trust Relationship | 16 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 16 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 16 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 15 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 15 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 15 |
| RR103-11 | Optimizing Project Organizations | 15 |
| RR105-11 | An Assessment Tool for Improving Team Communications | 15 |
| RR47-13 | Managing Uncertainty in the Piping Process | 15 |
| RS112-1 | 2% Engineering Can It Work for You? | 15 |
| RS20-2 | An Introduction to Integrated Database Systems | 15 |
| SD-66 | Construction Changes and Change Orders: Their Magnitude and Impact | 15 |
| RR123-11 | Modeling the Lessons Learned Process | 15 |
| RS12-1 | Project Objective Setting, Second Edition | 15 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 15 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 15 |
| BMM2006-2 | 2006 Safety Report | 15 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 15 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 15 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 15 |
| RS43-2 | Quantitative Effects of Project Change | 15 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 15 |
| RS34-2 | Preview of Constructability Implementation | 15 |
| RS101-1 | Design for Safety | 15 |
| RR47-11 | Improving Industrial Piping Through Vendor Data and Packaged Units Processes | 15 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 15 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 15 |
| RS134-1 | Identifying Success Factors for High Performance Project Teams | 15 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 15 |
| SD-86 | Zero Accident Techniques | 15 |
| SP43-1 | Project Change Management | 15 |
| SP39-2 | Pre-Project Planning Handbook | 15 |
| SD-41 | Risk Management in Capital Projects | 15 |
| RS49-1 | International Standards and U.S. Construction Industry Competitiveness | 15 |
| RS234-1 | Lean Implementation at the Project Level | 15 |
| IR161-2 | Small Projects Toolkit | 15 |
| IR200-3 | Recruiting and Retaining: Company Self-Assessment | 15 |
| RS140-1 | Employee-Based Project Incentives | 15 |
| RS114-1 | Innovative Contractor Compensation | 15 |
| RS203-1 | Making Zero Rework A Reality | 15 |
| SP31-1 | Implementing TQM in Engineering & Construction | 15 |
| BMM2003-2 | 2003 Safety Report | 15 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 15 |
| RR156-11 | Engineering Productivity Measurement | 15 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 15 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 15 |
| RS32-1 | Zero Injury Techniques | 15 |
| RS6-5 | Project Control for Construction | 15 |
| SD-66 | Construction Changes and Change Orders: Their Magnitude and Impact | 15 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 15 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 15 |
| RR130-11 | PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships | 15 |
| IR40-2 | A Framework for Continuing Supervisory Education | 15 |
| RS163-1 | Onsite Design: When and How Much? | 15 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 15 |
| IR200-3 | Recruiting and Retaining: Company Self-Assessment | 15 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 15 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 15 |
| IR125-2 | Determining the Impact of Process Change on the EPC Process | 15 |
| IR121-2 | Planning for Startup | 15 |
| RS101-1 | Design for Safety | 15 |
| RS140-1 | Employee-Based Project Incentives | 15 |
| RR172-11 | Improving Capital Projects Supply Chain Performance | 15 |
| RS214-1 | Trade-Off between Cost and Schedule | 15 |
| RS6-5 | Project Control for Construction | 15 |
| SP13 | Manual for Small (Special) Project Management | 15 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 15 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 15 |
| RS133-1 | Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build | 15 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 15 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 15 |
| RS112-1 | 2% Engineering Can It Work for You? | 15 |
| RS190-1 | The Owners’ Role in Construction Safety | 15 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 15 |
| RS184-1 | Introduction to the Value Management Toolkit | 14 |
| RS123-1 | Modeling the Lessons Learned Process | 14 |
| RS136-1 | Wireless Communication and Computing at the Construction Jobsite | 14 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 14 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 14 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 14 |
| AR-2006 | CII 2006 Annual Report | 14 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 14 |
| RS41-1 | Schedule Reduction | 14 |
| RS6-3 | Model Planning and Controlling System for EPC of Industrial Projects | 14 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 14 |
| SD-97 | Adaptation of Quality Function Deployment to Engineering and Construction Project Development | 14 |
| SP12-2 | Organizing for Project Success | 14 |
| SP39-2 | Pre-Project Planning Handbook | 14 |
| RR124-11 | Re-Engineering the EPC Process | 14 |
| RS105-1 | Compass: An Assessment Tool for Improving Project Team Communications | 14 |
| RR245-11 | Maximizing Engineering Value | 14 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 14 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 14 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 14 |
| SD-11 | Determining the Impact of Various Construction Contract Types and Clauses on Project Performance, Vol. II: Appendices | 14 |
| SD-105 | Analysis of Pre-Project Planning Effort and Success Variables for Capital Facility Projects | 14 |
| RS204-1 | The Owner’s Role in Project Success | 14 |
| RS20-3 | Achieving an Integrated Data Environment: A Strategic Initiative | 14 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 14 |
| RS220-1 | Leading Indicators during Project Execution | 14 |
| RS231-1 | Construction Industry Craft Training in the United States and Canada | 14 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 14 |
| IR181-2 | International Project Risk Assessment (IPRA) | 14 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 14 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 14 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 14 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 14 |
| RR156-11 | Engineering Productivity Measurement | 14 |
| RR101-11 | Addressing Construction Worker Safety in the Project Design | 14 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 14 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 14 |
| RR113-11 | Project Definition Rating Index (PDRI) | 14 |
| RR113-12 | Team Alignment During Pre-Project Planning of Capital Facilities | 14 |
| RR165-11 | Characteristics of Integrated Project Delivery and Contract Strategies | 14 |
| RS112-1 | 2% Engineering Can It Work for You? | 14 |
| RS142-1 | Design for Maintainability: Improving Project Return on Investment | 14 |
| RS165-1 | Owner’s Tool for Project Delivery and Contract Strategy Selection | 14 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 14 |
| RR182-11 | The Tier I Workforce Management Strategy: Concept and Application | 14 |
| RR113-12 | Team Alignment During Pre-Project Planning of Capital Facilities | 14 |
| RS143-1 | Craft Labor Productivity | 14 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 14 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 14 |
| IR121-2 | Planning for Startup | 14 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 14 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 14 |
| IR230-2 | Implementation of Lessons Learned Programs | 14 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 14 |
| SD-87 | Team Building: Implications for the Design/Construction Process | 14 |
| SD-41 | Risk Management in Capital Projects | 14 |
| SP13 | Manual for Small (Special) Project Management | 14 |
| SP14-1 | Construction Work Force Recruitment Resources Guide | 14 |
| RS6-6 | Work Packaging for Project Control | 14 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 14 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 14 |
| RR102-11 | The Partnering Process Its Benefits, Implementation and Measurement | 14 |
| RR142-11 | A Model Process for Maintainability Implementation | 14 |
| RR210-11 | Contracting to Appropriately Allocate Risk | 14 |
| IR40-2 | A Framework for Continuing Supervisory Education | 14 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 14 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 14 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 14 |
| IR102-2 | Partnering ToolKit (binder not included) | 14 |
| SP43-1 | Project Change Management | 14 |
| SD-88 | Construction Safety Self-Assessment Process | 14 |
| RS182-1 | The Shortage of Skilled Craft Workers in the U.S. | 14 |
| SD-16 | Evaluation of Design Effectiveness | 14 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 14 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 14 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 14 |
| BMM2006-10 | Lessons Learned in the Implementation of Best Practices for Project Security | 14 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 14 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 14 |
| RS34-2 | Preview of Constructability Implementation | 14 |
| RS190-1 | The Owners’ Role in Construction Safety | 14 |
| RS5-1 | Impact of Various Construction Contract Types and Clauses on Project Performance | 14 |
| SP32-2 | Zero Injury Economics | 14 |
| SP13 | Manual for Small (Special) Project Management | 14 |
| SP12-2 | Organizing for Project Success | 14 |
| BMM2001-2 | CII Benchmarking and Metrics 2001 Safety Report | 14 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 14 |
| RS13-1 | Managing Subcontractor Safety | 14 |
| RR160-11 | Safety Plus: Making Zero Accidents A Reality | 14 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 14 |
| RS6-1 | Project Control for Engineering | 14 |
| RS234-1 | Lean Implementation at the Project Level | 14 |
| RS241-1 | Optimizing Construction Input in Front End Planning | 14 |
| SP32-2 | Zero Injury Economics | 14 |
| SP39-2 | Pre-Project Planning Handbook | 14 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 14 |
| RR113-11 | Project Definition Rating Index (PDRI) | 14 |
| RR192-11 | Engineering Productivity Measurements II | 14 |
| IR192-2 | Engineering Productivity Measurement System | 14 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 14 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 14 |
| RS20-2 | An Introduction to Integrated Database Systems | 14 |
| RS230-1 | Effective Management Practices and Technologies for Lessons Learned Programs | 14 |
| RS6-1 | Project Control for Engineering | 14 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 13 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 13 |
| IR142-2 | Design for Maintainability Guidebook | 13 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 13 |
| IR121-2 | Planning for Startup | 13 |
| RR165-12 | Project Delivery and Contract Strategy | 13 |
| RR172-11 | Improving Capital Projects Supply Chain Performance | 13 |
| RR41-11 | An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry | 13 |
| RR222-11 | Best Practices for Design in Fast-Track Projects | 13 |
| RS158-1 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 13 |
| RS240-1 | Leveraging Technology to Improve Construction Productivity | 13 |
| RS191-1 | Lean Principles in Construction | 13 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 13 |
| SD-86 | Zero Accident Techniques | 13 |
| SP23-3 | Disputes Potential Index | 13 |
| SP39-2 | Pre-Project Planning Handbook | 13 |
| SP43-1 | Project Change Management | 13 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 13 |
| RS135-1 | Attracting and Maintaining a Skilled Construction Work Force | 13 |
| IR142-2 | Design for Maintainability Guidebook | 13 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 13 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 13 |
| CII-001 | CII Today: Core Competencies of the Construction Industry Institute, 2006 edition | 13 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 13 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 13 |
| IR211-2 | Global Virtual Engineering Team (GVET) Planner | 13 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 13 |
| RS23-1 | Disputes Prevention and Resolution Techniques in the Construction Industry | 13 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 13 |
| SD-20 | Construction Contractor Planning for Fixed-Price Construction | 13 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 13 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 13 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 13 |
| RR135-11 | Attracting and Maintaining A Skilled Workforce | 13 |
| RR156-11 | Engineering Productivity Measurement | 13 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 13 |
| RR103-11 | Optimizing Project Organizations | 13 |
| RS10-2 | Measuring the Cost of Quality in Design and Construction | 13 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 13 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 13 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 13 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 13 |
| RS182-1 | The Shortage of Skilled Craft Workers in the U.S. | 13 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 13 |
| RS30-1 | Competing in the Global Market | 13 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 13 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 13 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 13 |
| IR244-5 | Project Controls Team Learning and Development Program | 13 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 13 |
| RR135-11 | Attracting and Maintaining A Skilled Workforce | 13 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 13 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 13 |
| RS114-1 | Innovative Contractor Compensation | 13 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 13 |
| SD-4 | Constructability Improvement During Conceptual Planning | 13 |
| RS6-6 | Work Packaging for Project Control | 13 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 13 |
| RS216-1 | Targeted Safety Programs | 13 |
| SD-92 | Common Commodity Codes | 13 |
| SP13 | Manual for Small (Special) Project Management | 13 |
| SD-72 | Computerized Decision Support for Modularization of Industrial Construction | 13 |
| SP43-1 | Project Change Management | 13 |
| IR181-2 | International Project Risk Assessment (IPRA) | 13 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 13 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 13 |
| RS10-2 | Measuring the Cost of Quality in Design and Construction | 13 |
| RR113-11 | Project Definition Rating Index (PDRI) | 13 |
| RS6-4 | Contractor Planning for Fixed-Price Construction | 13 |
| RS49-1 | International Standards and U.S. Construction Industry Competitiveness | 13 |
| RS8-2 | Input Variables Impacting Design Effectiveness | 13 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 13 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 13 |
| RS121-1 | Planning for Startup: Overview of Research | 13 |
| RS10-2 | Measuring the Cost of Quality in Design and Construction | 13 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 13 |
| IR134-2 | Tools for Effective Project Team Leadership | 13 |
| BMM2001-10 | Impacts of Design/Information Technology on Building and Industrial Projects | 13 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 13 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 13 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 13 |
| IR173-2 | Technology Implementation Cycle | 13 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 13 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 13 |
| IR241-2 | Construction Input Assessment Tool, Version 1.1 | 13 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 13 |
| RS203-1 | Making Zero Rework A Reality | 13 |
| RS6-6 | Work Packaging for Project Control | 13 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 13 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 13 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 13 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 13 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 13 |
| RR134-11 | Identifying Success Factors for High Performance Work Teams | 13 |
| RR135-11 | Attracting and Maintaining A Skilled Workforce | 13 |
| RR152-11 | Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process for the Management of Construction | 13 |
| SD-101 | DPI Dispute Potential Index: A Study into the Predictability of Contract Disputes | 13 |
| SD-26 | Input Variables Impacting Design Effectiveness | 13 |
| SD-50 | Cost Effectiveness of Computerization in Design and Construction | 13 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 13 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 13 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 13 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 13 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 13 |
| IR151-2 | Radio Frequency Identification Tagging: Applications for the Construction Industry | 13 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 13 |
| RR160-11 | Safety Plus: Making Zero Accidents A Reality | 13 |
| SP39-2 | Pre-Project Planning Handbook | 13 |
| SP23-3 | Disputes Potential Index | 13 |
| SD-103 | Quality Performance Measurements of the EPC Process: The Blueprint | 13 |
| SD-66 | Construction Changes and Change Orders: Their Magnitude and Impact | 13 |
| RS192-1 | Engineering Productivity Measurements II | 13 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 12 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 12 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 12 |
| IR123-2 | Lessons Learned Wizard | 12 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 12 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 12 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 12 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 12 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 12 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 12 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 12 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 12 |
| RS37-1 | Team Building: Improving Project Performance | 12 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 12 |
| SP31-1 | Implementing TQM in Engineering & Construction | 12 |
| SP32-2 | Zero Injury Economics | 12 |
| RR124-11 | Re-Engineering the EPC Process | 12 |
| RR190-11 | The Owner’s Role in Construction Safety | 12 |
| RR190-11 | The Owner’s Role in Construction Safety | 12 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 12 |
| RR213-11 | Data Analysis in Support of Front End Planning Implementation | 12 |
| RS158-1 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 12 |
| RS143-1 | Craft Labor Productivity | 12 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 12 |
| RR40-11 | Supervisory Development for the Construction Industry | 12 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 12 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 12 |
| BMM2007-2 | 2007 Safety Report | 12 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 12 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 12 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 12 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 12 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 12 |
| IR181-2 | International Project Risk Assessment (IPRA) | 12 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 12 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 12 |
| RS6-6 | Work Packaging for Project Control | 12 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 12 |
| RS190-1 | The Owners’ Role in Construction Safety | 12 |
| IR133-2 | Project Delivery System Selection Workbook | 12 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 12 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 12 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 12 |
| RR152-11 | Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process for the Management of Construction | 12 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 12 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 12 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 12 |
| RS112-1 | 2% Engineering Can It Work for You? | 12 |
| RR245-11 | Maximizing Engineering Value | 12 |
| RR222-11 | Best Practices for Design in Fast-Track Projects | 12 |
| RS143-1 | Craft Labor Productivity | 12 |
| RS151-1 | Radio Frequency Identification Tagging | 12 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 12 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 12 |
| RS19-1 | Allocation of Insurance-Related Risks and Costs on Construction Projects | 12 |
| RS182-1 | The Shortage of Skilled Craft Workers in the U.S. | 12 |
| RS3-1 | Constructability: A Primer | 12 |
| RS32-1 | Zero Injury Techniques | 12 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 12 |
| SP39-2 | Pre-Project Planning Handbook | 12 |
| RR130-11 | PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships | 12 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 12 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 12 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 12 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 12 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 12 |
| IR173-2 | Technology Implementation Cycle | 12 |
| IR181-2 | International Project Risk Assessment (IPRA) | 12 |
| SD-79 | Quality Performance Measurements of the EPC Process: Current Practices | 12 |
| RS7-2 | Project Materials Management Primer | 12 |
| RS200-1 | Recruiting and Retaining Future Engineering and Construction Leaders | 12 |
| RS192-1 | Engineering Productivity Measurements II | 12 |
| RS190-1 | The Owners’ Role in Construction Safety | 12 |
| RS180-1 | E-Commerce Applications in Construction | 12 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 12 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 12 |
| RR142-12 | State-of-Practice in Maintainability: Seven Case Studies | 12 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 12 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 12 |
| IR192-2 | Engineering Productivity Measurement System | 12 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 12 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 12 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 12 |
| SD-67 | Indirect Costs of Construction Accidents | 12 |
| SD-50 | Cost Effectiveness of Computerization in Design and Construction | 12 |
| SD-86 | Zero Accident Techniques | 12 |
| RS3-1 | Constructability: A Primer | 12 |
| RS190-1 | The Owners’ Role in Construction Safety | 12 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 12 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 12 |
| SD-38 | Subcontractor Safety as Influenced by General Contractors on Small- and Medium-Sized Projects | 12 |
| SD-22 | Objectives Matrix Values for Evaluation of Design Effectiveness | 12 |
| RS143-1 | Craft Labor Productivity | 12 |
| RR158-11 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 12 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 12 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 12 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 12 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 12 |
| IR111-3 | Core Competency Toolkit | 12 |
| RS230-1 | Effective Management Practices and Technologies for Lessons Learned Programs | 12 |
| RS210-1 | Equitable Risk Allocation | 12 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 12 |
| BMM2007-2 | 2007 Safety Report | 12 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 12 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 12 |
| RR184-11 | Development of the Value Management Toolkit | 12 |
| RR152-11 | Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process for the Management of Construction | 12 |
| RR101-11 | Addressing Construction Worker Safety in the Project Design | 12 |
| RR112-11 | A Framework and Practices for Cost-Effective Engineering in Capital Projects in the A/E/C Industry | 12 |
| RR113-11 | Project Definition Rating Index (PDRI) | 12 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 12 |
| SD-26 | Input Variables Impacting Design Effectiveness | 12 |
| RS244-1 | Global Project Control and Management Systems | 12 |
| RS3-1 | Constructability: A Primer | 12 |
| RS180-1 | E-Commerce Applications in Construction | 12 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 12 |
| RS203-1 | Making Zero Rework A Reality | 12 |
| SP39-2 | Pre-Project Planning Handbook | 12 |
| SP43-1 | Project Change Management | 12 |
| RR221-11 | Information Flow to Support Front End Planning | 12 |
| RR215-11 | Work Force View of Construction Labor Productivity | 12 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 12 |
| RR170-11 | Virtual Teams: A Guide to Successful Implementation | 12 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 12 |
| RR123-11 | Modeling the Lessons Learned Process | 12 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 12 |
| IR102-2 | Partnering ToolKit (binder not included) | 12 |
| IR241-2 | Construction Input Assessment Tool, Version 1.1 | 12 |
| IR210-3 | Equitable Risk Allocation: A Legal Perspective | 12 |
| SP39-2 | Pre-Project Planning Handbook | 12 |
| SD-94 | Modeling Pre-Project Planning for the Construction of Capital Facilities | 12 |
| SD-72 | Computerized Decision Support for Modularization of Industrial Construction | 12 |
| SD-4 | Constructability Improvement During Conceptual Planning | 12 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 12 |
| RS211-1 | Planning A Global Virtual Engineering Team: A Tool for Success | 12 |
| RS43-2 | Quantitative Effects of Project Change | 12 |
| RS45-1 | Improved Workers' Compensation Management in Construction | 12 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 12 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 12 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 11 |
| IR170-2 | Virtual Teams: A Guide to Successful Implementation | 11 |
| IR185-2 | “Look-Up” Table for Crew Scheduling | 11 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 11 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 11 |
| IR142-2 | Design for Maintainability Guidebook | 11 |
| IR140-2 | Employee-Based Project Incentives Toolkit | 11 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 11 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 11 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 11 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 11 |
| RS230-1 | Effective Management Practices and Technologies for Lessons Learned Programs | 11 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 11 |
| RS192-1 | Engineering Productivity Measurements II | 11 |
| SD-4 | Constructability Improvement During Conceptual Planning | 11 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 11 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 11 |
| SP23-3 | Disputes Potential Index | 11 |
| RR142-11 | A Model Process for Maintainability Implementation | 11 |
| RS12-1 | Project Objective Setting, Second Edition | 11 |
| RR246-11 | Implementing CII Practices The Implementation Planning Model: Steps to Success | 11 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 11 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 11 |
| IR230-2 | Implementation of Lessons Learned Programs | 11 |
| IR42-2 | Guidelines for Implementation of CII Concepts: Best Practices for the Construction Industry | 11 |
| IR170-2 | Virtual Teams: A Guide to Successful Implementation | 11 |
| SP39-2 | Pre-Project Planning Handbook | 11 |
| SP31-1 | Implementing TQM in Engineering & Construction | 11 |
| SP31-1 | Implementing TQM in Engineering & Construction | 11 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 11 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 11 |
| SD-55 | Concepts and Methods of Schedule Compression | 11 |
| SD-66 | Construction Changes and Change Orders: Their Magnitude and Impact | 11 |
| SD-108 | Quantitative Impacts of Project Change | 11 |
| IR111-3 | Core Competency Toolkit | 11 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 11 |
| IR121-2 | Planning for Startup | 11 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 11 |
| IR181-2 | International Project Risk Assessment (IPRA) | 11 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 11 |
| RR135-11 | Attracting and Maintaining A Skilled Workforce | 11 |
| RR123-11 | Modeling the Lessons Learned Process | 11 |
| RR123-11 | Modeling the Lessons Learned Process | 11 |
| RR200-11 | Attracting, Recruiting, and Retaining Top Quality Construction Leaders/Managers | 11 |
| RS156-1 | Engineering Productivity Measurement | 11 |
| RR221-11 | Information Flow to Support Front End Planning | 11 |
| SD-4 | Constructability Improvement During Conceptual Planning | 11 |
| SD-108 | Quantitative Impacts of Project Change | 11 |
| RS20-2 | An Introduction to Integrated Database Systems | 11 |
| RS215-1 | Work Force View of Construction Productivity | 11 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 11 |
| RS3-1 | Constructability: A Primer | 11 |
| SP43-1 | Project Change Management | 11 |
| SD-85 | Constructability: Program Assessment and Barriers to Implementation | 11 |
| SD-67 | Indirect Costs of Construction Accidents | 11 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 11 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 11 |
| IR42-2 | Guidelines for Implementation of CII Concepts: Best Practices for the Construction Industry | 11 |
| IR181-2 | International Project Risk Assessment (IPRA) | 11 |
| IR211-2 | Global Virtual Engineering Team (GVET) Planner | 11 |
| IR134-2 | Tools for Effective Project Team Leadership | 11 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 11 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 11 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 11 |
| RR136-11 | Wireless Communication and Computing at the Construction Jobsite | 11 |
| RR192-11 | Engineering Productivity Measurements II | 11 |
| RS142-1 | Design for Maintainability: Improving Project Return on Investment | 11 |
| RS156-1 | Engineering Productivity Measurement | 11 |
| SD-12 | Project Control in Design Engineering | 11 |
| SD-100 | The Cost-Trust Relationship in the Construction Industry | 11 |
| RS45-1 | Improved Workers' Compensation Management in Construction | 11 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 11 |
| RS5-3 | Contract Risk Allocation and Cost Effectiveness | 11 |
| RS6-6 | Work Packaging for Project Control | 11 |
| RS7-2 | Project Materials Management Primer | 11 |
| RS230-1 | Effective Management Practices and Technologies for Lessons Learned Programs | 11 |
| SD-96 | The Optimal Allocation of Insurance Related Risks and Costs in Construction Projects | 11 |
| IR185-2 | “Look-Up” Table for Crew Scheduling | 11 |
| IR192-2 | Engineering Productivity Measurement System | 11 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 11 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 11 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 11 |
| IR213-3 | Front End Planning Process, Version 2.0 | 11 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 11 |
| IR211-2 | Global Virtual Engineering Team (GVET) Planner | 11 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 11 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 11 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 11 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 11 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 11 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 11 |
| RS106-1 | 3D CAD Link | 11 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 11 |
| RR213-12 | Case Study Analysis in Support of Front End Planning Implementation | 11 |
| RR233-11 | Planning for, Facilitating, and Evaluating Design Effectiveness | 11 |
| RR241-11 | Optimizing Construction Input in Front End Planning | 11 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 11 |
| RR182-11 | The Tier I Workforce Management Strategy: Concept and Application | 11 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 11 |
| RR201-11 | Leadership in a Knowledge Era: Achieving the Learning Organization | 11 |
| RR156-11 | Engineering Productivity Measurement | 11 |
| RR158-11 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 11 |
| RS161-1 | Small Project Execution | 11 |
| SD-35 | The Manual of Construction Productivity Measurement and Performance Evaluation | 11 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 11 |
| RS34-2 | Preview of Constructability Implementation | 11 |
| SP12-2 | Organizing for Project Success | 11 |
| SP31-1 | Implementing TQM in Engineering & Construction | 11 |
| RS155-1 | Pre-Project Planning Tool: PDRI for Buildings | 11 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 11 |
| RS121-1 | Planning for Startup: Overview of Research | 11 |
| RS134-1 | Identifying Success Factors for High Performance Project Teams | 11 |
| RR222-11 | Best Practices for Design in Fast-Track Projects | 11 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 11 |
| RR185-11 | The Effectiveness of Innovative Crew Scheduling Techniques | 11 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 11 |
| RR155-11 | Development of a Project Definition Rating Index (PDRI) for Building Projects | 11 |
| RR130-11 | PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships | 11 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 11 |
| IR125-2 | Determining the Impact of Process Change on the EPC Process | 11 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 11 |
| IR142-2 | Design for Maintainability Guidebook | 11 |
| IR142-2 | Design for Maintainability Guidebook | 11 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 11 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 11 |
| IR213-3 | Front End Planning Process, Version 2.0 | 11 |
| IR204-2 | Project Priority Calculator | 11 |
| SD-80 | Project Performance Modeling: A Methodology for Evaluating Project Execution Strategies | 11 |
| RS214-1 | Trade-Off between Cost and Schedule | 11 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 11 |
| RS7-2 | Project Materials Management Primer | 11 |
| SD-22 | Objectives Matrix Values for Evaluation of Design Effectiveness | 11 |
| SD-39 | Subcontractor Safety as Influenced by General Contractors on Large Projects | 11 |
| RS34-2 | Preview of Constructability Implementation | 11 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 11 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 11 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 11 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 11 |
| RS121-1 | Planning for Startup: Overview of Research | 11 |
| RS121-1 | Planning for Startup: Overview of Research | 11 |
| RR213-11 | Data Analysis in Support of Front End Planning Implementation | 11 |
| RR211-11 | Effective Use of the Global Engineering Workforce | 11 |
| RR113-12 | Team Alignment During Pre-Project Planning of Capital Facilities | 11 |
| RR113-12 | Team Alignment During Pre-Project Planning of Capital Facilities | 11 |
| RR155-11 | Development of a Project Definition Rating Index (PDRI) for Building Projects | 11 |
| RS190-1 | The Owners’ Role in Construction Safety | 11 |
| RS190-1 | The Owners’ Role in Construction Safety | 11 |
| RS6-5 | Project Control for Construction | 11 |
| RS5-3 | Contract Risk Allocation and Cost Effectiveness | 11 |
| RS49-1 | International Standards and U.S. Construction Industry Competitiveness | 11 |
| RS43-2 | Quantitative Effects of Project Change | 11 |
| SD-102 | Perceptions of Representatives Concerning Project Success and Pre-Project Planning Effort | 11 |
| SD-99 | The Effects of Change on Labor Productivity: Why and How Much | 11 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 11 |
| RR103-11 | Optimizing Project Organizations | 11 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 11 |
| IR181-2 | International Project Risk Assessment (IPRA) | 11 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 11 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 11 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 11 |
| RR165-11 | Characteristics of Integrated Project Delivery and Contract Strategies | 11 |
| RR215-11 | Work Force View of Construction Labor Productivity | 11 |
| RS123-1 | Modeling the Lessons Learned Process | 11 |
| RS125-1 | Cost and Schedule Impacts of Information Management | 11 |
| RS112-1 | 2% Engineering Can It Work for You? | 11 |
| RS105-1 | Compass: An Assessment Tool for Improving Project Team Communications | 11 |
| SD-108 | Quantitative Impacts of Project Change | 11 |
| RS6-7 | Concepts and Methods of Schedule Compression | 11 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 11 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 11 |
| RS200-1 | Recruiting and Retaining Future Engineering and Construction Leaders | 11 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 11 |
| RS106-1 | 3D CAD Link | 10 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 10 |
| RS165-1 | Owner’s Tool for Project Delivery and Contract Strategy Selection | 10 |
| RR213-11 | Data Analysis in Support of Front End Planning Implementation | 10 |
| RR231-11 | Construction Industry Craft Training in the United States and Canada | 10 |
| RR234-11 | Roadmap for Lean Implementation at the Project Level | 10 |
| RR180-12 | Case Studies of e-Commerce Initiatives | 10 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 10 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 10 |
| IR121-2 | Planning for Startup | 10 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 10 |
| IR134-2 | Tools for Effective Project Team Leadership | 10 |
| IR102-2 | Partnering ToolKit (binder not included) | 10 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 10 |
| BMM2005-2 | 2005 Safety Report | 10 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 10 |
| IR40-2 | A Framework for Continuing Supervisory Education | 10 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 10 |
| RS2-3 | Productivity Measurement: An Introduction | 10 |
| RS3-1 | Constructability: A Primer | 10 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 10 |
| SP32-2 | Zero Injury Economics | 10 |
| SP39-2 | Pre-Project Planning Handbook | 10 |
| SD-95 | Dispute Prevention and Resolution | 10 |
| SD-89 | Alliances in International Construction | 10 |
| SD-89 | Alliances in International Construction | 10 |
| SP39-2 | Pre-Project Planning Handbook | 10 |
| SP43-1 | Project Change Management | 10 |
| RR106-11 | An Analysis of the Impacts of Using Three-Dimensional Computer Models in the Management of Construction | 10 |
| RR123-11 | Modeling the Lessons Learned Process | 10 |
| RR166-11 | Assessment of CII Knowledge Implementation at the Organizational Level | 10 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 10 |
| RS134-1 | Identifying Success Factors for High Performance Project Teams | 10 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 10 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 10 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 10 |
| IR121-2 | Planning for Startup | 10 |
| IR121-2 | Planning for Startup | 10 |
| IR121-2 | Planning for Startup | 10 |
| IR134-2 | Tools for Effective Project Team Leadership | 10 |
| IR111-3 | Core Competency Toolkit | 10 |
| IR BMM-3 | Implementing Project Security Practices | 10 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 10 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 10 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 10 |
| IR192-2 | Engineering Productivity Measurement System | 10 |
| IR210-3 | Equitable Risk Allocation: A Legal Perspective | 10 |
| IR40-2 | A Framework for Continuing Supervisory Education | 10 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 10 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 10 |
| IR213-3 | Front End Planning Process, Version 2.0 | 10 |
| IR213-3 | Front End Planning Process, Version 2.0 | 10 |
| IR213-3 | Front End Planning Process, Version 2.0 | 10 |
| SP13 | Manual for Small (Special) Project Management | 10 |
| SD-92 | Common Commodity Codes | 10 |
| SD-94 | Modeling Pre-Project Planning for the Construction of Capital Facilities | 10 |
| SD-87 | Team Building: Implications for the Design/Construction Process | 10 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 10 |
| SD-69 | Identifying Customer Requirements Through Quality Function Deployment | 10 |
| SD-104 | 3-D Modeling as a Tool to Improve Integrated Design in Construction | 10 |
| SD-44 | Impact of Risk Allocation and Equity in Construction Contracts | 10 |
| RS6-3 | Model Planning and Controlling System for EPC of Industrial Projects | 10 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 10 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 10 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 10 |
| RS215-1 | Work Force View of Construction Productivity | 10 |
| RS23-1 | Disputes Prevention and Resolution Techniques in the Construction Industry | 10 |
| RS34-2 | Preview of Constructability Implementation | 10 |
| RS30-1 | Competing in the Global Market | 10 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 10 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 10 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 10 |
| BMM2003-2 | 2003 Safety Report | 10 |
| IR133-2 | Project Delivery System Selection Workbook | 10 |
| IR161-2 | Small Projects Toolkit | 10 |
| IR161-2 | Small Projects Toolkit | 10 |
| IR121-2 | Planning for Startup | 10 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 10 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 10 |
| RR130-11 | PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships | 10 |
| RR192-11 | Engineering Productivity Measurements II | 10 |
| RR214-11 | Trade-Off Between Cost and Schedule | 10 |
| RR215-11 | Work Force View of Construction Labor Productivity | 10 |
| RR163-11 | Onsite Design | 10 |
| RS12-1 | Project Objective Setting, Second Edition | 10 |
| RS158-1 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 10 |
| RS6-7 | Concepts and Methods of Schedule Compression | 10 |
| RS6-4 | Contractor Planning for Fixed-Price Construction | 10 |
| RS41-1 | Schedule Reduction | 10 |
| RS192-1 | Engineering Productivity Measurements II | 10 |
| RS2-2 | Construction Industry Institute Model Plant Update | 10 |
| RS244-1 | Global Project Control and Management Systems | 10 |
| SP43-1 | Project Change Management | 10 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 10 |
| RR211-11 | Effective Use of the Global Engineering Workforce | 10 |
| RR200-11 | Attracting, Recruiting, and Retaining Top Quality Construction Leaders/Managers | 10 |
| RR184-11 | Development of the Value Management Toolkit | 10 |
| RR123-11 | Modeling the Lessons Learned Process | 10 |
| RR113-11 | Project Definition Rating Index (PDRI) | 10 |
| RR101-11 | Addressing Construction Worker Safety in the Project Design | 10 |
| RS114-1 | Innovative Contractor Compensation | 10 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 10 |
| BMM2001-2 | CII Benchmarking and Metrics 2001 Safety Report | 10 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 10 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 10 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 10 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 10 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 10 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 10 |
| IR242-2 | Front End Planning of Renovation and Revamp Projects | 10 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 10 |
| SP31-1 | Implementing TQM in Engineering & Construction | 10 |
| SP32-2 | Zero Injury Economics | 10 |
| STR-2005 | CII Strategic Plan, 2005-2007 | 10 |
| RS41-1 | Schedule Reduction | 10 |
| RS6-5 | Project Control for Construction | 10 |
| RS6-1 | Project Control for Engineering | 10 |
| SD-38 | Subcontractor Safety as Influenced by General Contractors on Small- and Medium-Sized Projects | 10 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 10 |
| SD-103 | Quality Performance Measurements of the EPC Process: The Blueprint | 10 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 10 |
| RS3-1 | Constructability: A Primer | 10 |
| RS155-1 | Pre-Project Planning Tool: PDRI for Buildings | 10 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 10 |
| RS123-1 | Modeling the Lessons Learned Process | 10 |
| RS114-1 | Innovative Contractor Compensation | 10 |
| RR214-11 | Trade-Off Between Cost and Schedule | 10 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 10 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 10 |
| RR113-11 | Project Definition Rating Index (PDRI) | 10 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 10 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 10 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 10 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 10 |
| IR121-2 | Planning for Startup | 10 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 10 |
| IR134-2 | Tools for Effective Project Team Leadership | 10 |
| IR142-2 | Design for Maintainability Guidebook | 10 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 10 |
| IR192-2 | Engineering Productivity Measurement System | 10 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 10 |
| IR242-2 | Front End Planning of Renovation and Revamp Projects | 10 |
| IR230-2 | Implementation of Lessons Learned Programs | 10 |
| IR213-3 | Front End Planning Process, Version 2.0 | 10 |
| IR213-3 | Front End Planning Process, Version 2.0 | 10 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 10 |
| SP23-3 | Disputes Potential Index | 10 |
| RS3-1 | Constructability: A Primer | 10 |
| RS8-1 | Evaluation of Design Effectiveness | 10 |
| SD-102 | Perceptions of Representatives Concerning Project Success and Pre-Project Planning Effort | 10 |
| SD-12 | Project Control in Design Engineering | 10 |
| SD-35 | The Manual of Construction Productivity Measurement and Performance Evaluation | 10 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 10 |
| RS101-1 | Design for Safety | 10 |
| RS10-2 | Measuring the Cost of Quality in Design and Construction | 10 |
| RS112-1 | 2% Engineering Can It Work for You? | 10 |
| RS13-1 | Managing Subcontractor Safety | 10 |
| RR192-11 | Engineering Productivity Measurements II | 10 |
| RR215-11 | Work Force View of Construction Labor Productivity | 10 |
| RR165-12 | Project Delivery and Contract Strategy | 10 |
| RR112-11 | A Framework and Practices for Cost-Effective Engineering in Capital Projects in the A/E/C Industry | 10 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 10 |
| RR143-11 | Determinants of Jobsite Productivity | 10 |
| IR170-2 | Virtual Teams: A Guide to Successful Implementation | 10 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 10 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 10 |
| IR192-2 | Engineering Productivity Measurement System | 10 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 10 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 10 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 10 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 10 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 10 |
| BMM2002-2 | 2002 Safety Report | 10 |
| IR102-2 | Partnering ToolKit (binder not included) | 10 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 10 |
| SP12-2 | Organizing for Project Success | 10 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 10 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 10 |
| SP13 | Manual for Small (Special) Project Management | 10 |
| RS241-1 | Optimizing Construction Input in Front End Planning | 10 |
| RS34-2 | Preview of Constructability Implementation | 10 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 10 |
| RS205-1 | Commodity vs Value-Added Contractor Services | 10 |
| RS190-1 | The Owners’ Role in Construction Safety | 10 |
| RS191-1 | Lean Principles in Construction | 10 |
| RS185-1 | Effectiveness of Innovative Crew Scheduling | 10 |
| SD-16 | Evaluation of Design Effectiveness | 10 |
| SD-19 | Defining and Evaluating Input Variables Impacting Design Effectiveness: Research Phase I | 10 |
| SD-22 | Objectives Matrix Values for Evaluation of Design Effectiveness | 10 |
| RS49-1 | International Standards and U.S. Construction Industry Competitiveness | 10 |
| RS6-1 | Project Control for Engineering | 10 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 10 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 10 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 10 |
| IR BMM-3 | Implementing Project Security Practices | 10 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 10 |
| IR121-2 | Planning for Startup | 10 |
| RS101-1 | Design for Safety | 10 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 10 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 10 |
| RR140-11 | Project-Specific Employee Incentives | 10 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 10 |
| RR113-12 | Team Alignment During Pre-Project Planning of Capital Facilities | 10 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 10 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 10 |
| RR158-11 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 10 |
| RR170-11 | Virtual Teams: A Guide to Successful Implementation | 10 |
| SD-104 | 3-D Modeling as a Tool to Improve Integrated Design in Construction | 10 |
| SD-31 | Project Objective-Setting by Owners and Contractors | 10 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 10 |
| RS6-6 | Work Packaging for Project Control | 10 |
| RS2-3 | Productivity Measurement: An Introduction | 10 |
| RS190-1 | The Owners’ Role in Construction Safety | 10 |
| RS191-1 | Lean Principles in Construction | 10 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 10 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 10 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 10 |
| RS3-1 | Constructability: A Primer | 10 |
| RS34-2 | Preview of Constructability Implementation | 10 |
| RS3-1 | Constructability: A Primer | 10 |
| SD-83 | Benefits and Costs of Constructability: Four Case Studies | 10 |
| RR200-11 | Attracting, Recruiting, and Retaining Top Quality Construction Leaders/Managers | 10 |
| RR180-11 | State-of-Practice of E-Commerce Application in the Construction Industry | 10 |
| RR105-11 | An Assessment Tool for Improving Team Communications | 10 |
| RR40-11 | Supervisory Development for the Construction Industry | 10 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 10 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 10 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 10 |
| IR121-2 | Planning for Startup | 10 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 10 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 10 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 10 |
| CII-25 | Building On 25 Years | 10 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 10 |
| IR192-2 | Engineering Productivity Measurement System | 10 |
| IR204-2 | Project Priority Calculator | 10 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 10 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 10 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 10 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 10 |
| SD-94 | Modeling Pre-Project Planning for the Construction of Capital Facilities | 10 |
| SD-79 | Quality Performance Measurements of the EPC Process: Current Practices | 10 |
| RS185-1 | Effectiveness of Innovative Crew Scheduling | 10 |
| RS161-1 | Small Project Execution | 10 |
| RS215-1 | Work Force View of Construction Productivity | 10 |
| SD-28 | Work Packaging for Project Control | 10 |
| SD-28 | Work Packaging for Project Control | 10 |
| IR213-3 | Front End Planning Process, Version 2.0 | 9 |
| IR242-2 | Front End Planning of Renovation and Revamp Projects | 9 |
| IR230-2 | Implementation of Lessons Learned Programs | 9 |
| IR181-2 | International Project Risk Assessment (IPRA) | 9 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 9 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 9 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 9 |
| IR192-2 | Engineering Productivity Measurement System | 9 |
| GOV-2006 | Governance Plan | 9 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 9 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 9 |
| IR125-2 | Determining the Impact of Process Change on the EPC Process | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| RS114-1 | Innovative Contractor Compensation | 9 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 9 |
| RS155-1 | Pre-Project Planning Tool: PDRI for Buildings | 9 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 9 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 9 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 9 |
| SD-22 | Objectives Matrix Values for Evaluation of Design Effectiveness | 9 |
| RS8-1 | Evaluation of Design Effectiveness | 9 |
| RS6-6 | Work Packaging for Project Control | 9 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 9 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 9 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 9 |
| RS165-1 | Owner’s Tool for Project Delivery and Contract Strategy Selection | 9 |
| RS185-1 | Effectiveness of Innovative Crew Scheduling | 9 |
| SD-79 | Quality Performance Measurements of the EPC Process: Current Practices | 9 |
| SD-79 | Quality Performance Measurements of the EPC Process: Current Practices | 9 |
| SD-85 | Constructability: Program Assessment and Barriers to Implementation | 9 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 9 |
| SP39-2 | Pre-Project Planning Handbook | 9 |
| SP23-3 | Disputes Potential Index | 9 |
| SP14-2 | An Assessment of Education and Training Needs Among Construction Personnel | 9 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 9 |
| RR160A-11 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 9 |
| RR184-11 | Development of the Value Management Toolkit | 9 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 9 |
| RR193-11 | Radical Reduction in Project Cycle Time | 9 |
| RR215-11 | Work Force View of Construction Labor Productivity | 9 |
| RR40-11 | Supervisory Development for the Construction Industry | 9 |
| RS12-1 | Project Objective Setting, Second Edition | 9 |
| RS152-1 | 3D CAD and FIAPP: Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process | 9 |
| IR121-2 | Planning for Startup | 9 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 9 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 9 |
| BMM2008-2 | 2008 Safety Report | 9 |
| IR181-2 | International Project Risk Assessment (IPRA) | 9 |
| IR170-2 | Virtual Teams: A Guide to Successful Implementation | 9 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 9 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 9 |
| IR241-2 | Construction Input Assessment Tool, Version 1.1 | 9 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 9 |
| SD-88 | Construction Safety Self-Assessment Process | 9 |
| RS3-1 | Constructability: A Primer | 9 |
| RS244-1 | Global Project Control and Management Systems | 9 |
| RS241-1 | Optimizing Construction Input in Front End Planning | 9 |
| RS240-1 | Leveraging Technology to Improve Construction Productivity | 9 |
| RS222-1 | Best Modern Practices for Design in Fast Track Projects | 9 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 9 |
| RS192-1 | Engineering Productivity Measurements II | 9 |
| RS6-1 | Project Control for Engineering | 9 |
| RS41-1 | Schedule Reduction | 9 |
| RS8-2 | Input Variables Impacting Design Effectiveness | 9 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 9 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 9 |
| BMM2006-2 | 2006 Safety Report | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| IR133-2 | Project Delivery System Selection Workbook | 9 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 9 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 9 |
| IR125-2 | Determining the Impact of Process Change on the EPC Process | 9 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 9 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 9 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 9 |
| IR45-2 | A Field Guide to Workers’ Compensation | 9 |
| IR246-2 | The Implementation Planning Model: Steps to Success, Version 1.2 | 9 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 9 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 9 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 9 |
| RR136-11 | Wireless Communication and Computing at the Construction Jobsite | 9 |
| RR113-12 | Team Alignment During Pre-Project Planning of Capital Facilities | 9 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 9 |
| RR165-11 | Characteristics of Integrated Project Delivery and Contract Strategies | 9 |
| RR180-11 | State-of-Practice of E-Commerce Application in the Construction Industry | 9 |
| RR184-11 | Development of the Value Management Toolkit | 9 |
| RS15-1 | Emerging Construction Technologies and the Advanced Construction Technology System (ACTS) | 9 |
| RR246-11 | Implementing CII Practices The Implementation Planning Model: Steps to Success | 9 |
| RS5-1 | Impact of Various Construction Contract Types and Clauses on Project Performance | 9 |
| RS6-6 | Work Packaging for Project Control | 9 |
| SD-47 | Bar Code Standardization in Industrial Construction | 9 |
| RS2-3 | Productivity Measurement: An Introduction | 9 |
| RS32-1 | Zero Injury Techniques | 9 |
| RS214-1 | Trade-Off between Cost and Schedule | 9 |
| RS216-1 | Targeted Safety Programs | 9 |
| RS220-1 | Leading Indicators during Project Execution | 9 |
| RS234-1 | Lean Implementation at the Project Level | 9 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 9 |
| SD-55 | Concepts and Methods of Schedule Compression | 9 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 9 |
| IR213-3 | Front End Planning Process, Version 2.0 | 9 |
| IR213-3 | Front End Planning Process, Version 2.0 | 9 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 9 |
| IR242-2 | Front End Planning of Renovation and Revamp Projects | 9 |
| IR246-2 | The Implementation Planning Model: Steps to Success, Version 1.2 | 9 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 9 |
| IR204-2 | Project Priority Calculator | 9 |
| IR151-2 | Radio Frequency Identification Tagging: Applications for the Construction Industry | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| IR121-2 | Planning for Startup | 9 |
| IR121-2 | Planning for Startup | 9 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 9 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 9 |
| RR124-11 | Re-Engineering the EPC Process | 9 |
| RR123-11 | Modeling the Lessons Learned Process | 9 |
| RR111-11 | Owner/Contractor Work Structure: A Process Approach | 9 |
| RR181-11 | Development of the International Project Risk Assessment (IPRA) Tool | 9 |
| RR165-12 | Project Delivery and Contract Strategy | 9 |
| RR203-11 | Making Zero Rework A Reality: A Comparison of Zero Accident Methodology to Zero Rework and Quality Management | 9 |
| RS114-1 | Innovative Contractor Compensation | 9 |
| RS102-1 | Model for Partnering Excellence | 9 |
| RS105-1 | Compass: An Assessment Tool for Improving Project Team Communications | 9 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 9 |
| RR232-11 | Examination of the Shipbuilding Industry | 9 |
| RR41-11 | An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry | 9 |
| RS12-1 | Project Objective Setting, Second Edition | 9 |
| RS123-1 | Modeling the Lessons Learned Process | 9 |
| RS124-1 | Exceptional Projects and Methods of Improving Project Performance | 9 |
| RS136-1 | Wireless Communication and Computing at the Construction Jobsite | 9 |
| RS158-1 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 9 |
| SD-108 | Quantitative Impacts of Project Change | 9 |
| RS7-2 | Project Materials Management Primer | 9 |
| RS6-7 | Concepts and Methods of Schedule Compression | 9 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 9 |
| RS246-1 | The Implementation Planning Model: An Overview | 9 |
| RS32-1 | Zero Injury Techniques | 9 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 9 |
| RS163-1 | Onsite Design: When and How Much? | 9 |
| RS191-1 | Lean Principles in Construction | 9 |
| RS184-1 | Introduction to the Value Management Toolkit | 9 |
| RS210-1 | Equitable Risk Allocation | 9 |
| SP32-2 | Zero Injury Economics | 9 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 9 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 9 |
| SD-89 | Alliances in International Construction | 9 |
| SP13 | Manual for Small (Special) Project Management | 9 |
| SD-85 | Constructability: Program Assessment and Barriers to Implementation | 9 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 9 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 9 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 9 |
| IR211-2 | Global Virtual Engineering Team (GVET) Planner | 9 |
| IR203-2 | Zero Field Rework Self-Assessment Opportunity Checklist | 9 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 9 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 9 |
| BMM2002-2 | 2002 Safety Report | 9 |
| RS111-1 | Owner/Contractor Work Structure: A Preview | 9 |
| RS125-1 | Cost and Schedule Impacts of Information Management | 9 |
| RS13-1 | Managing Subcontractor Safety | 9 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 9 |
| RR112-11 | A Framework and Practices for Cost-Effective Engineering in Capital Projects in the A/E/C Industry | 9 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 9 |
| RS205-1 | Commodity vs Value-Added Contractor Services | 9 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 9 |
| RS214-1 | Trade-Off between Cost and Schedule | 9 |
| RS6-7 | Concepts and Methods of Schedule Compression | 9 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 9 |
| RS37-1 | Team Building: Improving Project Performance | 9 |
| SP39-2 | Pre-Project Planning Handbook | 9 |
| SD-4 | Constructability Improvement During Conceptual Planning | 9 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 9 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 9 |
| RS134-1 | Identifying Success Factors for High Performance Project Teams | 9 |
| RR216-11 | Target Safety: Programs Focused on Preventing Specific Hazards | 9 |
| RR221-11 | Information Flow to Support Front End Planning | 9 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 9 |
| RR165-11 | Characteristics of Integrated Project Delivery and Contract Strategies | 9 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 9 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 9 |
| RR181-11 | Development of the International Project Risk Assessment (IPRA) Tool | 9 |
| RR193-11 | Radical Reduction in Project Cycle Time | 9 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 9 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 9 |
| RR102-11 | The Partnering Process Its Benefits, Implementation and Measurement | 9 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 9 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 9 |
| IR121-2 | Planning for Startup | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 9 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 9 |
| BMM2004-10 | Best Practices for Project Security | 9 |
| IR48-2 | Environmental Remediation Management: An Eight-Step Process | 9 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 9 |
| IR230-2 | Implementation of Lessons Learned Programs | 9 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 9 |
| IR211-2 | Global Virtual Engineering Team (GVET) Planner | 9 |
| IR204-2 | Project Priority Calculator | 9 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 9 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 9 |
| SD-69 | Identifying Customer Requirements Through Quality Function Deployment | 9 |
| SD-56 | A Methodology for Identifying Automation Opportunities in Industrial Construction | 9 |
| SD-66 | Construction Changes and Change Orders: Their Magnitude and Impact | 9 |
| SD-94 | Modeling Pre-Project Planning for the Construction of Capital Facilities | 9 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 9 |
| RS215-1 | Work Force View of Construction Productivity | 9 |
| RS183-1 | Design Practices to Facilitate Construction Automation | 9 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 9 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 9 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 9 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 9 |
| SD-35 | The Manual of Construction Productivity Measurement and Performance Evaluation | 9 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 9 |
| IR45-2 | A Field Guide to Workers’ Compensation | 9 |
| RR101-11 | Addressing Construction Worker Safety in the Project Design | 9 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 9 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 9 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 9 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 9 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 9 |
| RR246-11 | Implementing CII Practices The Implementation Planning Model: Steps to Success | 9 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 9 |
| RR205-11 | Commodity vs Value-Added Contractor Services | 9 |
| RR210-11 | Contracting to Appropriately Allocate Risk | 9 |
| RR123-11 | Modeling the Lessons Learned Process | 9 |
| RR103-11 | Optimizing Project Organizations | 9 |
| RR105-11 | An Assessment Tool for Improving Team Communications | 9 |
| RR113-11 | Project Definition Rating Index (PDRI) | 9 |
| RS34-2 | Preview of Constructability Implementation | 9 |
| RS37-1 | Team Building: Improving Project Performance | 9 |
| RS6-4 | Contractor Planning for Fixed-Price Construction | 9 |
| RS7-2 | Project Materials Management Primer | 9 |
| RS6-1 | Project Control for Engineering | 9 |
| SD-12 | Project Control in Design Engineering | 9 |
| SD-67 | Indirect Costs of Construction Accidents | 9 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 9 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 9 |
| SP32-2 | Zero Injury Economics | 9 |
| SP43-1 | Project Change Management | 9 |
| SP43-1 | Project Change Management | 9 |
| RR101-11 | Addressing Construction Worker Safety in the Project Design | 9 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 9 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 9 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 9 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 9 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 9 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 9 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 9 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 9 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 9 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 9 |
| RR113-12 | Team Alignment During Pre-Project Planning of Capital Facilities | 9 |
| RR137-12 | Multiskilling Labor Strategies in Construction: Experiences with Multiskilling Labor Strategies in the Construction Industry | 9 |
| RR172-11 | Improving Capital Projects Supply Chain Performance | 9 |
| RR231-11 | Construction Industry Craft Training in the United States and Canada | 9 |
| RS166-1 | Measuring Organizational Implementation Status: Development of the CII Knowledge Implementation Index (CKII) | 9 |
| RS142-1 | Design for Maintainability: Improving Project Return on Investment | 9 |
| RR40-11 | Supervisory Development for the Construction Industry | 9 |
| SD-92 | Common Commodity Codes | 9 |
| SP31-1 | Implementing TQM in Engineering & Construction | 9 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 9 |
| SP23-3 | Disputes Potential Index | 9 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 9 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 9 |
| SD-83 | Benefits and Costs of Constructability: Four Case Studies | 9 |
| SD-85 | Constructability: Program Assessment and Barriers to Implementation | 9 |
| SD-33 | Bar Code Applications in Construction | 9 |
| RS246-1a | The Role of Executive Support in Implementation Champion Success | 9 |
| RS37-1 | Team Building: Improving Project Performance | 9 |
| RS34-2 | Preview of Constructability Implementation | 9 |
| RS6-1 | Project Control for Engineering | 9 |
| RS5-3 | Contract Risk Allocation and Cost Effectiveness | 9 |
| RS5-1 | Impact of Various Construction Contract Types and Clauses on Project Performance | 9 |
| RS203-1 | Making Zero Rework A Reality | 9 |
| RS245-1 | Maximizing Engineering Value | 9 |
| RS222-1 | Best Modern Practices for Design in Fast Track Projects | 9 |
| RR40-11 | Supervisory Development for the Construction Industry | 8 |
| RR41-11 | An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry | 8 |
| RR47-11 | Improving Industrial Piping Through Vendor Data and Packaged Units Processes | 8 |
| RS112-1 | 2% Engineering Can It Work for You? | 8 |
| RS101-1 | Design for Safety | 8 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 8 |
| RS114-1 | Innovative Contractor Compensation | 8 |
| RS142-1 | Design for Maintainability: Improving Project Return on Investment | 8 |
| RS156-1 | Engineering Productivity Measurement | 8 |
| RS165-1 | Owner’s Tool for Project Delivery and Contract Strategy Selection | 8 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 8 |
| RR182-11 | The Tier I Workforce Management Strategy: Concept and Application | 8 |
| RR185-11 | The Effectiveness of Innovative Crew Scheduling Techniques | 8 |
| RR185-11 | The Effectiveness of Innovative Crew Scheduling Techniques | 8 |
| RR205-11 | Commodity vs Value-Added Contractor Services | 8 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 8 |
| RR134-11 | Identifying Success Factors for High Performance Work Teams | 8 |
| RR142-12 | State-of-Practice in Maintainability: Seven Case Studies | 8 |
| RR143-11 | Determinants of Jobsite Productivity | 8 |
| RR123-11 | Modeling the Lessons Learned Process | 8 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR102-2 | Partnering ToolKit (binder not included) | 8 |
| IR213-3 | Front End Planning Process, Version 2.0 | 8 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 8 |
| IR200-3 | Recruiting and Retaining: Company Self-Assessment | 8 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 8 |
| IR45-2 | A Field Guide to Workers’ Compensation | 8 |
| RS183-1 | Design Practices to Facilitate Construction Automation | 8 |
| RS191-1 | Lean Principles in Construction | 8 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 8 |
| RS34-2 | Preview of Constructability Implementation | 8 |
| SD-35 | The Manual of Construction Productivity Measurement and Performance Evaluation | 8 |
| SD-86 | Zero Accident Techniques | 8 |
| SD-87 | Team Building: Implications for the Design/Construction Process | 8 |
| SD-79 | Quality Performance Measurements of the EPC Process: Current Practices | 8 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 8 |
| RS8-1 | Evaluation of Design Effectiveness | 8 |
| SP23-3 | Disputes Potential Index | 8 |
| SP39-2 | Pre-Project Planning Handbook | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP43-1 | Project Change Management | 8 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 8 |
| RR143-11 | Determinants of Jobsite Productivity | 8 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 8 |
| RR166-11 | Assessment of CII Knowledge Implementation at the Organizational Level | 8 |
| RR166-11 | Assessment of CII Knowledge Implementation at the Organizational Level | 8 |
| RR173-11 | Construction Technology Needs Assessment Update | 8 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 8 |
| RS140-1 | Employee-Based Project Incentives | 8 |
| RS123-1 | Modeling the Lessons Learned Process | 8 |
| RS125-1 | Cost and Schedule Impacts of Information Management | 8 |
| RR41-11 | An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry | 8 |
| RS106-1 | 3D CAD Link | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR123-2 | Lessons Learned Wizard | 8 |
| IR121-2 | Planning for Startup | 8 |
| IR140-2 | Employee-Based Project Incentives Toolkit | 8 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 8 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 8 |
| BMM2005-10 | Pharmaceutical Benchmarking Summary Report | 8 |
| IR170-2 | Virtual Teams: A Guide to Successful Implementation | 8 |
| IR181-2 | International Project Risk Assessment (IPRA) | 8 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 8 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 8 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 8 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 8 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 8 |
| RS163-1 | Onsite Design: When and How Much? | 8 |
| SP39-2 | Pre-Project Planning Handbook | 8 |
| SP32-2 | Zero Injury Economics | 8 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 8 |
| SD-90 | The Future Needs of the Construction Industry’s Worldwide Customers | 8 |
| SD-108 | Quantitative Impacts of Project Change | 8 |
| RS6-1 | Project Control for Engineering | 8 |
| RS42-1 | Barriers to Implementation of CII Concepts: An Overview | 8 |
| RS41-1 | Schedule Reduction | 8 |
| RS6-6 | Work Packaging for Project Control | 8 |
| RS32-1 | Zero Injury Techniques | 8 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 8 |
| RS215-1 | Work Force View of Construction Productivity | 8 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 8 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 8 |
| IR181-2 | International Project Risk Assessment (IPRA) | 8 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 8 |
| IR213-3 | Front End Planning Process, Version 2.0 | 8 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 8 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 8 |
| IR213-3 | Front End Planning Process, Version 2.0 | 8 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 8 |
| IR48-2 | Environmental Remediation Management: An Eight-Step Process | 8 |
| BMM2004-10 | Best Practices for Project Security | 8 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 8 |
| BMM2005-2 | 2005 Safety Report | 8 |
| IR111-3 | Core Competency Toolkit | 8 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 8 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 8 |
| IR125-2 | Determining the Impact of Process Change on the EPC Process | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| RR111-11 | Owner/Contractor Work Structure: A Process Approach | 8 |
| RR142-11 | A Model Process for Maintainability Implementation | 8 |
| RR184-11 | Development of the Value Management Toolkit | 8 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 8 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 8 |
| RR160A-11 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 8 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 8 |
| RR234-11 | Roadmap for Lean Implementation at the Project Level | 8 |
| RS135-1 | Attracting and Maintaining a Skilled Construction Work Force | 8 |
| RS156-1 | Engineering Productivity Measurement | 8 |
| SD-31 | Project Objective-Setting by Owners and Contractors | 8 |
| SD-102 | Perceptions of Representatives Concerning Project Success and Pre-Project Planning Effort | 8 |
| RS6-5 | Project Control for Construction | 8 |
| RS37-1 | Team Building: Improving Project Performance | 8 |
| RS34-2 | Preview of Constructability Implementation | 8 |
| RS43-2 | Quantitative Effects of Project Change | 8 |
| RS49-1 | International Standards and U.S. Construction Industry Competitiveness | 8 |
| RS180-1 | E-Commerce Applications in Construction | 8 |
| RS161-1 | Small Project Execution | 8 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 8 |
| RS32-1 | Zero Injury Techniques | 8 |
| SD-99 | The Effects of Change on Labor Productivity: Why and How Much | 8 |
| SD-47 | Bar Code Standardization in Industrial Construction | 8 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 8 |
| SD-74 | Guidelines for Implementing TQM in the Engineering and Construction Industry | 8 |
| SD-74 | Guidelines for Implementing TQM in the Engineering and Construction Industry | 8 |
| SD-74 | Guidelines for Implementing TQM in the Engineering and Construction Industry | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP48-3 | Influence of Potential Soil Contamination on Construction Projects | 8 |
| SP43-1 | Project Change Management | 8 |
| SP39-2 | Pre-Project Planning Handbook | 8 |
| RR123-11 | Modeling the Lessons Learned Process | 8 |
| RR143-11 | Determinants of Jobsite Productivity | 8 |
| RR142-11 | A Model Process for Maintainability Implementation | 8 |
| RR161-11 | Factors Impacting Small Capital Project Execution | 8 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 8 |
| RR234-11 | Roadmap for Lean Implementation at the Project Level | 8 |
| RR214-11 | Trade-Off Between Cost and Schedule | 8 |
| RR215-11 | Work Force View of Construction Labor Productivity | 8 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 8 |
| RS143-1 | Craft Labor Productivity | 8 |
| RS142-1 | Design for Maintainability: Improving Project Return on Investment | 8 |
| RS143-1 | Craft Labor Productivity | 8 |
| RS125-1 | Cost and Schedule Impacts of Information Management | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 8 |
| IR161-2 | Small Projects Toolkit | 8 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 8 |
| IR142-2 | Design for Maintainability Guidebook | 8 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 8 |
| IR204-2 | Project Priority Calculator | 8 |
| IR240-2 | LEVER: The Technology Prediction Tool | 8 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 8 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 8 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 8 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 8 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 8 |
| SD-4 | Constructability Improvement During Conceptual Planning | 8 |
| SD-67 | Indirect Costs of Construction Accidents | 8 |
| SD-80 | Project Performance Modeling: A Methodology for Evaluating Project Execution Strategies | 8 |
| SD-88 | Construction Safety Self-Assessment Process | 8 |
| SD-90 | The Future Needs of the Construction Industry’s Worldwide Customers | 8 |
| SP48-3 | Influence of Potential Soil Contamination on Construction Projects | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP32-2 | Zero Injury Economics | 8 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 8 |
| SP12-2 | Organizing for Project Success | 8 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 8 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 8 |
| RS6-7 | Concepts and Methods of Schedule Compression | 8 |
| SD-39 | Subcontractor Safety as Influenced by General Contractors on Large Projects | 8 |
| RS23-1 | Disputes Prevention and Resolution Techniques in the Construction Industry | 8 |
| RS204-1 | The Owner’s Role in Project Success | 8 |
| RS233-1 | Evaluation of Design Effectiveness | 8 |
| RS192-1 | Engineering Productivity Measurements II | 8 |
| RS20-3 | Achieving an Integrated Data Environment: A Strategic Initiative | 8 |
| RS184-1 | Introduction to the Value Management Toolkit | 8 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 8 |
| RS165-1 | Owner’s Tool for Project Delivery and Contract Strategy Selection | 8 |
| RS155-1 | Pre-Project Planning Tool: PDRI for Buildings | 8 |
| RS143-1 | Craft Labor Productivity | 8 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 8 |
| RS134-1 | Identifying Success Factors for High Performance Project Teams | 8 |
| RS121-1 | Planning for Startup: Overview of Research | 8 |
| RS105-1 | Compass: An Assessment Tool for Improving Project Team Communications | 8 |
| RR49-11 | International Standards: U.S. Construction Industry Competitiveness | 8 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 8 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 8 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 8 |
| RR203-11 | Making Zero Rework A Reality: A Comparison of Zero Accident Methodology to Zero Rework and Quality Management | 8 |
| RR193-11 | Radical Reduction in Project Cycle Time | 8 |
| RR193-11 | Radical Reduction in Project Cycle Time | 8 |
| RR163-11 | Onsite Design | 8 |
| RR105-11 | An Assessment Tool for Improving Team Communications | 8 |
| RR143-11 | Determinants of Jobsite Productivity | 8 |
| RR156-11 | Engineering Productivity Measurement | 8 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 8 |
| BMM2006-2 | 2006 Safety Report | 8 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 8 |
| AR-2005 | CII 2005 Annual Report | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR134-2 | Tools for Effective Project Team Leadership | 8 |
| IR200-2 | The Future Starts Now: Recommendations for Recruiting and Retaining Future Engineering and Construction Leaders | 8 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 8 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 8 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 8 |
| SD-83 | Benefits and Costs of Constructability: Four Case Studies | 8 |
| SD-80 | Project Performance Modeling: A Methodology for Evaluating Project Execution Strategies | 8 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 8 |
| SD-57 | Data Integration Strategies in Construction | 8 |
| SD-66 | Construction Changes and Change Orders: Their Magnitude and Impact | 8 |
| SP13 | Manual for Small (Special) Project Management | 8 |
| SD-99 | The Effects of Change on Labor Productivity: Why and How Much | 8 |
| SD-87 | Team Building: Implications for the Design/Construction Process | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP23-3 | Disputes Potential Index | 8 |
| SP39-2 | Pre-Project Planning Handbook | 8 |
| RS201-1 | Leadership in a Knowledge Era: Achieving the Learning Organization | 8 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 8 |
| RS2-3 | Productivity Measurement: An Introduction | 8 |
| RS185-1 | Effectiveness of Innovative Crew Scheduling | 8 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 8 |
| RS32-1 | Zero Injury Techniques | 8 |
| RS36-1 | Measuring Quality Performance on EPC Projects | 8 |
| RS234-1 | Lean Implementation at the Project Level | 8 |
| RS240-1 | Leveraging Technology to Improve Construction Productivity | 8 |
| RS220-1 | Leading Indicators during Project Execution | 8 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 8 |
| RS49-1 | International Standards and U.S. Construction Industry Competitiveness | 8 |
| RS41-1 | Schedule Reduction | 8 |
| RS6-5 | Project Control for Construction | 8 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 8 |
| SD-107 | A Multi-Media Design Aid for Project Hazard Identification & Remediation, Part I | 8 |
| SD-105 | Analysis of Pre-Project Planning Effort and Success Variables for Capital Facility Projects | 8 |
| SD-24 | Cost and Schedule Control in Industrial Construction | 8 |
| SD-41 | Risk Management in Capital Projects | 8 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 8 |
| RS105-1 | Compass: An Assessment Tool for Improving Project Team Communications | 8 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 8 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 8 |
| RS10-2 | Measuring the Cost of Quality in Design and Construction | 8 |
| RS143-1 | Craft Labor Productivity | 8 |
| RS121-1 | Planning for Startup: Overview of Research | 8 |
| RS121-1 | Planning for Startup: Overview of Research | 8 |
| RR165-12 | Project Delivery and Contract Strategy | 8 |
| RR210-11 | Contracting to Appropriately Allocate Risk | 8 |
| RR190-11 | The Owner’s Role in Construction Safety | 8 |
| RR123-11 | Modeling the Lessons Learned Process | 8 |
| RR103-11 | Optimizing Project Organizations | 8 |
| RR102-11 | The Partnering Process Its Benefits, Implementation and Measurement | 8 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 8 |
| RR156-11 | Engineering Productivity Measurement | 8 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 8 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 8 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 8 |
| IR185-2 | “Look-Up” Table for Crew Scheduling | 8 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 8 |
| IR200-2 | The Future Starts Now: Recommendations for Recruiting and Retaining Future Engineering and Construction Leaders | 8 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 8 |
| IR246-2 | The Implementation Planning Model: Steps to Success, Version 1.2 | 8 |
| IR246-2 | The Implementation Planning Model: Steps to Success, Version 1.2 | 8 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 8 |
| IR121-2 | Planning for Startup | 8 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 8 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 8 |
| BMM2005-10 | Pharmaceutical Benchmarking Summary Report | 8 |
| BMM2002-2 | 2002 Safety Report | 8 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 8 |
| BMM2003-2 | 2003 Safety Report | 8 |
| IR102-2 | Partnering ToolKit (binder not included) | 8 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 8 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 8 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 8 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 8 |
| SD-83 | Benefits and Costs of Constructability: Four Case Studies | 8 |
| SD-80 | Project Performance Modeling: A Methodology for Evaluating Project Execution Strategies | 8 |
| SP12-2 | Organizing for Project Success | 8 |
| SD-97 | Adaptation of Quality Function Deployment to Engineering and Construction Project Development | 8 |
| SD-97 | Adaptation of Quality Function Deployment to Engineering and Construction Project Development | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP39-2 | Pre-Project Planning Handbook | 8 |
| SP39-2 | Pre-Project Planning Handbook | 8 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 8 |
| RS240-1 | Leveraging Technology to Improve Construction Productivity | 8 |
| RS3-1 | Constructability: A Primer | 8 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 8 |
| RS192-1 | Engineering Productivity Measurements II | 8 |
| RS190-1 | The Owners’ Role in Construction Safety | 8 |
| RS183-1 | Design Practices to Facilitate Construction Automation | 8 |
| SD-26 | Input Variables Impacting Design Effectiveness | 8 |
| SD-15 | Analysis of Construction Contract Change Clauses, Volume II | 8 |
| SD-102 | Perceptions of Representatives Concerning Project Success and Pre-Project Planning Effort | 8 |
| RS6-1 | Project Control for Engineering | 8 |
| RS6-3 | Model Planning and Controlling System for EPC of Industrial Projects | 8 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 8 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 8 |
| IR204-2 | Project Priority Calculator | 8 |
| IR BMM-3 | Implementing Project Security Practices | 8 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 8 |
| BMM2006-11 | Impacts of Automation and Integration Technologies on Project and Company Performance | 8 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 8 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 8 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 8 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 8 |
| IR111-3 | Core Competency Toolkit | 8 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| RS152-1 | 3D CAD and FIAPP: Three-Dimensional Computer Models and the Fully Integrated and Automated Project Process | 8 |
| RS12-1 | Project Objective Setting, Second Edition | 8 |
| RS13-1 | Managing Subcontractor Safety | 8 |
| RS121-1 | Planning for Startup: Overview of Research | 8 |
| RS101-1 | Design for Safety | 8 |
| RS10-2 | Measuring the Cost of Quality in Design and Construction | 8 |
| RS102-1 | Model for Partnering Excellence | 8 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 8 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 8 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 8 |
| RR172-11 | Improving Capital Projects Supply Chain Performance | 8 |
| IR48-2 | Environmental Remediation Management: An Eight-Step Process | 8 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 8 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 8 |
| SD-103 | Quality Performance Measurements of the EPC Process: The Blueprint | 8 |
| RS43-2 | Quantitative Effects of Project Change | 8 |
| RS6-1 | Project Control for Engineering | 8 |
| RS6-6 | Work Packaging for Project Control | 8 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 8 |
| RS205-1 | Commodity vs Value-Added Contractor Services | 8 |
| RS20-3 | Achieving an Integrated Data Environment: A Strategic Initiative | 8 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 8 |
| RS24-1 | Cost-Trust Relationship | 8 |
| RS32-1 | Zero Injury Techniques | 8 |
| SP13 | Manual for Small (Special) Project Management | 8 |
| SP12-2 | Organizing for Project Success | 8 |
| SD-72 | Computerized Decision Support for Modularization of Industrial Construction | 8 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 8 |
| SP43-1 | Project Change Management | 8 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 8 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 8 |
| RS143-1 | Craft Labor Productivity | 8 |
| RS12-1 | Project Objective Setting, Second Edition | 8 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 8 |
| RR213-12 | Case Study Analysis in Support of Front End Planning Implementation | 8 |
| RR215-11 | Work Force View of Construction Labor Productivity | 8 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 8 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 8 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 8 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 8 |
| IR102-2 | Partnering ToolKit (binder not included) | 8 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 8 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 8 |
| IR192-2 | Engineering Productivity Measurement System | 8 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 8 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 8 |
| IR240-2 | LEVER: The Technology Prediction Tool | 8 |
| IR45-2 | A Field Guide to Workers’ Compensation | 8 |
| IR213-3 | Front End Planning Process, Version 2.0 | 8 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 8 |
| SP39-2 | Pre-Project Planning Handbook | 8 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 8 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 8 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 8 |
| SD-88 | Construction Safety Self-Assessment Process | 8 |
| SD-92 | Common Commodity Codes | 8 |
| SD-38 | Subcontractor Safety as Influenced by General Contractors on Small- and Medium-Sized Projects | 8 |
| SD-57 | Data Integration Strategies in Construction | 8 |
| RS20-3 | Achieving an Integrated Data Environment: A Strategic Initiative | 8 |
| RS200-1 | Recruiting and Retaining Future Engineering and Construction Leaders | 8 |
| RS180-1 | E-Commerce Applications in Construction | 8 |
| RS161-1 | Small Project Execution | 8 |
| RS234-1 | Lean Implementation at the Project Level | 8 |
| RS6-5 | Project Control for Construction | 8 |
| RS5-3 | Contract Risk Allocation and Cost Effectiveness | 8 |
| RS6-3 | Model Planning and Controlling System for EPC of Industrial Projects | 8 |
| RS43-2 | Quantitative Effects of Project Change | 8 |
| RS41-1 | Schedule Reduction | 8 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 8 |
| SD-35 | The Manual of Construction Productivity Measurement and Performance Evaluation | 8 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR244-5 | Project Controls Team Learning and Development Program | 7 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 7 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 7 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 7 |
| IR173-2 | Technology Implementation Cycle | 7 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 7 |
| IR181-2 | International Project Risk Assessment (IPRA) | 7 |
| IR204-2 | Project Priority Calculator | 7 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 7 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 7 |
| BMM2004-2 | 2004 Safety Report | 7 |
| IR121-2 | Planning for Startup | 7 |
| IR123-2 | Lessons Learned Wizard | 7 |
| IR123-2 | Lessons Learned Wizard | 7 |
| IR125-2 | Determining the Impact of Process Change on the EPC Process | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR111-3 | Core Competency Toolkit | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 7 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 7 |
| RR245-11 | Maximizing Engineering Value | 7 |
| RR49-11 | International Standards: U.S. Construction Industry Competitiveness | 7 |
| RR41-11 | An Investigation of Schedule Reduction Techniques for the Engineering and Construction Industry | 7 |
| RS111-1 | Owner/Contractor Work Structure: A Preview | 7 |
| RS121-1 | Planning for Startup: Overview of Research | 7 |
| RS12-1 | Project Objective Setting, Second Edition | 7 |
| RS114-1 | Innovative Contractor Compensation | 7 |
| RS143-1 | Craft Labor Productivity | 7 |
| RS140-1 | Employee-Based Project Incentives | 7 |
| RR153-11 | An Investigation of Field Rework in Industrial Construction | 7 |
| RR155-11 | Development of a Project Definition Rating Index (PDRI) for Building Projects | 7 |
| RR192-11 | Engineering Productivity Measurements II | 7 |
| RR192-11 | Engineering Productivity Measurements II | 7 |
| RR184-11 | Development of the Value Management Toolkit | 7 |
| RR190-11 | The Owner’s Role in Construction Safety | 7 |
| RR156-11 | Engineering Productivity Measurement | 7 |
| RR160-11 | Safety Plus: Making Zero Accidents A Reality | 7 |
| SD-22 | Objectives Matrix Values for Evaluation of Design Effectiveness | 7 |
| SD-108 | Quantitative Impacts of Project Change | 7 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 7 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 7 |
| RS8-2 | Input Variables Impacting Design Effectiveness | 7 |
| SD-105 | Analysis of Pre-Project Planning Effort and Success Variables for Capital Facility Projects | 7 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 7 |
| RS6-5 | Project Control for Construction | 7 |
| RS234-1 | Lean Implementation at the Project Level | 7 |
| RS231-1 | Construction Industry Craft Training in the United States and Canada | 7 |
| RS244-1 | Global Project Control and Management Systems | 7 |
| RS161-1 | Small Project Execution | 7 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 7 |
| RS20-2 | An Introduction to Integrated Database Systems | 7 |
| RS191-1 | Lean Principles in Construction | 7 |
| SD-41 | Risk Management in Capital Projects | 7 |
| SD-41 | Risk Management in Capital Projects | 7 |
| SD-92 | Common Commodity Codes | 7 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 7 |
| SP39-2 | Pre-Project Planning Handbook | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP14-1 | Construction Work Force Recruitment Resources Guide | 7 |
| SP12-2 | Organizing for Project Success | 7 |
| SP31-1 | Implementing TQM in Engineering & Construction | 7 |
| SP17-1 | In Search of Partnering Excellence | 7 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 7 |
| RR105-11 | An Assessment Tool for Improving Team Communications | 7 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 7 |
| RR158-11 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 7 |
| RR183-11 | Design Practices to Facilitate Construction Automation | 7 |
| RR181-11 | Development of the International Project Risk Assessment (IPRA) Tool | 7 |
| RR204-11 | The Owner’s Role in Project Success | 7 |
| RR210-11 | Contracting to Appropriately Allocate Risk | 7 |
| RS10-2 | Measuring the Cost of Quality in Design and Construction | 7 |
| RS101-1 | Design for Safety | 7 |
| RR251-11 | Nanotechnology and its Impact on Construction | 7 |
| RR45-11 | Improved Workers’ Compensation Management in Construction | 7 |
| RR47-13 | Managing Uncertainty in the Piping Process | 7 |
| RR231-11 | Construction Industry Craft Training in the United States and Canada | 7 |
| RS123-1 | Modeling the Lessons Learned Process | 7 |
| RS125-1 | Cost and Schedule Impacts of Information Management | 7 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR123-2 | Lessons Learned Wizard | 7 |
| IR125-2 | Determining the Impact of Process Change on the EPC Process | 7 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 7 |
| IR134-2 | Tools for Effective Project Team Leadership | 7 |
| IR142-2 | Design for Maintainability Guidebook | 7 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 7 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 7 |
| BMM2006-2 | 2006 Safety Report | 7 |
| BMM2006-2 | 2006 Safety Report | 7 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 7 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 7 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 7 |
| IR102-2 | Partnering ToolKit (binder not included) | 7 |
| BMM2008-2 | 2008 Safety Report | 7 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 7 |
| IR203-2 | Zero Field Rework Self-Assessment Opportunity Checklist | 7 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 7 |
| IR192-2 | Engineering Productivity Measurement System | 7 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 7 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 7 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 7 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 7 |
| IR181-2 | International Project Risk Assessment (IPRA) | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 7 |
| IR213-3 | Front End Planning Process, Version 2.0 | 7 |
| IR23-2 | Prevention and Resolution of Disputes Using Disputes Review Boards | 7 |
| RS156-1 | Engineering Productivity Measurement | 7 |
| SP43-1 | Project Change Management | 7 |
| SP43-1 | Project Change Management | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 7 |
| SP39-2 | Pre-Project Planning Handbook | 7 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SD-67 | Indirect Costs of Construction Accidents | 7 |
| SP12-2 | Organizing for Project Success | 7 |
| SD-94 | Modeling Pre-Project Planning for the Construction of Capital Facilities | 7 |
| RS214-1 | Trade-Off between Cost and Schedule | 7 |
| RS161-1 | Small Project Execution | 7 |
| RS163-1 | Onsite Design: When and How Much? | 7 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 7 |
| RS201-1 | Leadership in a Knowledge Era: Achieving the Learning Organization | 7 |
| RS192-1 | Engineering Productivity Measurements II | 7 |
| RS192-1 | Engineering Productivity Measurements II | 7 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 7 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 7 |
| RS6-1 | Project Control for Engineering | 7 |
| RS8-2 | Input Variables Impacting Design Effectiveness | 7 |
| RS8-1 | Evaluation of Design Effectiveness | 7 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 7 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 7 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 7 |
| RS165-1 | Owner’s Tool for Project Delivery and Contract Strategy Selection | 7 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 7 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 7 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 7 |
| BMM2005-10 | Pharmaceutical Benchmarking Summary Report | 7 |
| IR151-2 | Radio Frequency Identification Tagging: Applications for the Construction Industry | 7 |
| IR151-2 | Radio Frequency Identification Tagging: Applications for the Construction Industry | 7 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 7 |
| IR121-2 | Planning for Startup | 7 |
| IR121-2 | Planning for Startup | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 7 |
| IR254-2 | Implementing and Improving Quality Management Systems in the Capital Facilities Delivery Industry | 7 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 7 |
| IR193-3 | Project Manager’s Playbook for Radical Reduction in Project Cycle Time | 7 |
| IR200-2 | The Future Starts Now: Recommendations for Recruiting and Retaining Future Engineering and Construction Leaders | 7 |
| IR204-2 | Project Priority Calculator | 7 |
| IR181-2 | International Project Risk Assessment (IPRA) | 7 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 7 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 7 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 7 |
| IR173-2 | Technology Implementation Cycle | 7 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 7 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 7 |
| RR137-12 | Multiskilling Labor Strategies in Construction: Experiences with Multiskilling Labor Strategies in the Construction Industry | 7 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 7 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 7 |
| RR113-11 | Project Definition Rating Index (PDRI) | 7 |
| RR185-11 | The Effectiveness of Innovative Crew Scheduling Techniques | 7 |
| RR211-11 | Effective Use of the Global Engineering Workforce | 7 |
| RR160-11 | Safety Plus: Making Zero Accidents A Reality | 7 |
| RR181-11 | Development of the International Project Risk Assessment (IPRA) Tool | 7 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 7 |
| RS114-1 | Innovative Contractor Compensation | 7 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 7 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 7 |
| RS102-1 | Model for Partnering Excellence | 7 |
| RS111-1 | Owner/Contractor Work Structure: A Preview | 7 |
| RS111-1 | Owner/Contractor Work Structure: A Preview | 7 |
| RS112-1 | 2% Engineering Can It Work for You? | 7 |
| RS112-1 | 2% Engineering Can It Work for You? | 7 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 7 |
| RS47-1 | Piping: Improving P&IDs, Supplier Data, and Packaged Units | 7 |
| RS6-7 | Concepts and Methods of Schedule Compression | 7 |
| RS6-4 | Contractor Planning for Fixed-Price Construction | 7 |
| RS7-2 | Project Materials Management Primer | 7 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 7 |
| SD-14 | Analysis of Construction Contract Change Clauses, Volume I | 7 |
| SD-16 | Evaluation of Design Effectiveness | 7 |
| SD-4 | Constructability Improvement During Conceptual Planning | 7 |
| SD-41 | Risk Management in Capital Projects | 7 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 7 |
| RS165-1 | Owner’s Tool for Project Delivery and Contract Strategy Selection | 7 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 7 |
| RS205-1 | Commodity vs Value-Added Contractor Services | 7 |
| RS254-1 | Best Practices in Quality Management for the Capital Facilities Delivery Industry | 7 |
| RS222-1 | Best Modern Practices for Design in Fast Track Projects | 7 |
| RS215-1 | Work Force View of Construction Productivity | 7 |
| SP43-1 | Project Change Management | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 7 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 7 |
| SP12-2 | Organizing for Project Success | 7 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 7 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 7 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 7 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 7 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 7 |
| IR213-3 | Front End Planning Process, Version 2.0 | 7 |
| IR213-3 | Front End Planning Process, Version 2.0 | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR47-2 | Tools for Enhancing the Piping Engineering Process | 7 |
| IR48-2 | Environmental Remediation Management: An Eight-Step Process | 7 |
| IR42-2 | Guidelines for Implementation of CII Concepts: Best Practices for the Construction Industry | 7 |
| IR230-2 | Implementation of Lessons Learned Programs | 7 |
| IR166-2 | Implementation Model + Knowledge Structure Guide | 7 |
| IR200-3 | Recruiting and Retaining: Company Self-Assessment | 7 |
| IR181-2 | International Project Risk Assessment (IPRA) | 7 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 7 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| BMM2001-10 | Impacts of Design/Information Technology on Building and Industrial Projects | 7 |
| BMM2005-2 | 2005 Safety Report | 7 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 7 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 7 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 7 |
| RR158-11 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 7 |
| RR106-11 | An Analysis of the Impacts of Using Three-Dimensional Computer Models in the Management of Construction | 7 |
| RR112-11 | A Framework and Practices for Cost-Effective Engineering in Capital Projects in the A/E/C Industry | 7 |
| RR123-11 | Modeling the Lessons Learned Process | 7 |
| RR123-11 | Modeling the Lessons Learned Process | 7 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 7 |
| RR130-11 | PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships | 7 |
| RR190-11 | The Owner’s Role in Construction Safety | 7 |
| RR192-11 | Engineering Productivity Measurements II | 7 |
| RS111-1 | Owner/Contractor Work Structure: A Preview | 7 |
| RS112-1 | 2% Engineering Can It Work for You? | 7 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 7 |
| RR47-13 | Managing Uncertainty in the Piping Process | 7 |
| RR231-11 | Construction Industry Craft Training in the United States and Canada | 7 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 7 |
| RS155-1 | Pre-Project Planning Tool: PDRI for Buildings | 7 |
| RS158-1 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 7 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 7 |
| SD-4 | Constructability Improvement During Conceptual Planning | 7 |
| SD-4 | Constructability Improvement During Conceptual Planning | 7 |
| SD-31 | Project Objective-Setting by Owners and Contractors | 7 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 7 |
| RS6-7 | Concepts and Methods of Schedule Compression | 7 |
| RS6-4 | Contractor Planning for Fixed-Price Construction | 7 |
| RS37-1 | Team Building: Improving Project Performance | 7 |
| RS49-1 | International Standards and U.S. Construction Industry Competitiveness | 7 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 7 |
| RS214-1 | Trade-Off between Cost and Schedule | 7 |
| RS232-1 | Examination of the Shipbuilding Industry | 7 |
| RS34-2 | Preview of Constructability Implementation | 7 |
| RS242-1 | Front End Planning for Renovation and Revamp Projects: An Overview | 7 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 7 |
| RS184-1 | Introduction to the Value Management Toolkit | 7 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 7 |
| RS203-1 | Making Zero Rework A Reality | 7 |
| SP43-1 | Project Change Management | 7 |
| SP43-1 | Project Change Management | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SD-92 | Common Commodity Codes | 7 |
| SD-6 | Control of Construction Project Scope | 7 |
| SD-64 | Anatomy of Construction Industry Competition in the Year 2000 | 7 |
| SD-66 | Construction Changes and Change Orders: Their Magnitude and Impact | 7 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 7 |
| IR185-2 | “Look-Up” Table for Crew Scheduling | 7 |
| IR230-2 | Implementation of Lessons Learned Programs | 7 |
| IR203-2 | Zero Field Rework Self-Assessment Opportunity Checklist | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR131-2 | Improving Early Estimates Best Practices Guide | 7 |
| IR111-2 | Owner/Contractor Work Structure Process Handbook | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 7 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 7 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 7 |
| BMM2002-2 | 2002 Safety Report | 7 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 7 |
| IR105-2 | Communications Project Assessment Tool (Compass), User's Guide | 7 |
| BMM2006-11 | Impacts of Automation and Integration Technologies on Project and Company Performance | 7 |
| RS12-1 | Project Objective Setting, Second Edition | 7 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 7 |
| RR221-11 | Information Flow to Support Front End Planning | 7 |
| RR231-11 | Construction Industry Craft Training in the United States and Canada | 7 |
| RR47-13 | Managing Uncertainty in the Piping Process | 7 |
| RR49-11 | International Standards: U.S. Construction Industry Competitiveness | 7 |
| RR47-11 | Improving Industrial Piping Through Vendor Data and Packaged Units Processes | 7 |
| RR171-12 | Development of a Decision-Support Tool for Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication | 7 |
| RR161-11 | Factors Impacting Small Capital Project Execution | 7 |
| RR158-11 | Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors | 7 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 7 |
| RR193-11 | Radical Reduction in Project Cycle Time | 7 |
| RR143-11 | Determinants of Jobsite Productivity | 7 |
| RR140-11 | Project-Specific Employee Incentives | 7 |
| RR123-11 | Modeling the Lessons Learned Process | 7 |
| RR123-11 | Modeling the Lessons Learned Process | 7 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 7 |
| RR113-11 | Project Definition Rating Index (PDRI) | 7 |
| RR102-11 | The Partnering Process Its Benefits, Implementation and Measurement | 7 |
| RS156-1 | Engineering Productivity Measurement | 7 |
| RS171-1 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication in Industrial Construction: A Framework for Decision-Making | 7 |
| RS192-1 | Engineering Productivity Measurements II | 7 |
| RS30-1 | Competing in the Global Market | 7 |
| RS216-1 | Targeted Safety Programs | 7 |
| RS216-1 | Targeted Safety Programs | 7 |
| RS220-1 | Leading Indicators during Project Execution | 7 |
| SD-16 | Evaluation of Design Effectiveness | 7 |
| SD-108 | Quantitative Impacts of Project Change | 7 |
| RS7-1 | Costs and Benefits of Materials Management Systems | 7 |
| RS37-1 | Team Building: Improving Project Performance | 7 |
| RS43-2 | Quantitative Effects of Project Change | 7 |
| RS6-1 | Project Control for Engineering | 7 |
| RS5-1 | Impact of Various Construction Contract Types and Clauses on Project Performance | 7 |
| SP14-2 | An Assessment of Education and Training Needs Among Construction Personnel | 7 |
| SP32-2 | Zero Injury Economics | 7 |
| SP23-3 | Disputes Potential Index | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP39-2 | Pre-Project Planning Handbook | 7 |
| SP4 | Project Materials Management Handbook | 7 |
| SD-92 | Common Commodity Codes | 7 |
| SD-70 | Bar Code System Standardization | 7 |
| SD-72 | Computerized Decision Support for Modularization of Industrial Construction | 7 |
| SD-4 | Constructability Improvement During Conceptual Planning | 7 |
| SD-4 | Constructability Improvement During Conceptual Planning | 7 |
| SD-4 | Constructability Improvement During Conceptual Planning | 7 |
| RS160-1 | Safety Plus: Making Zero Accidents A Reality | 7 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 7 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize Supplier Roles in EPC Projects | 7 |
| RS13-1 | Managing Subcontractor Safety | 7 |
| RR245-11 | Maximizing Engineering Value | 7 |
| RS101-1 | Design for Safety | 7 |
| RR47-13 | Managing Uncertainty in the Piping Process | 7 |
| RR182-11 | The Tier I Workforce Management Strategy: Concept and Application | 7 |
| RR184-11 | Development of the Value Management Toolkit | 7 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 7 |
| RR142-11 | A Model Process for Maintainability Implementation | 7 |
| RR125-11 | Determining the Impact of Information Management on Project Schedule and Cost | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 7 |
| IR134-2 | Tools for Effective Project Team Leadership | 7 |
| BMM2006-11 | Impacts of Automation and Integration Technologies on Project and Company Performance | 7 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 7 |
| IR7-3 | Procurement and Materials Management: A Guide to Effective Project Execution | 7 |
| IR211-2 | Global Virtual Engineering Team (GVET) Planner | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR173-2 | Technology Implementation Cycle | 7 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 7 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 7 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 7 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 7 |
| IR192-2 | Engineering Productivity Measurement System | 7 |
| IR181-2 | International Project Risk Assessment (IPRA) | 7 |
| SP39-2 | Pre-Project Planning Handbook | 7 |
| SP43-1 | Project Change Management | 7 |
| SP32-2 | Zero Injury Economics | 7 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 7 |
| SP13 | Manual for Small (Special) Project Management | 7 |
| SP12-2 | Organizing for Project Success | 7 |
| SD-95 | Dispute Prevention and Resolution | 7 |
| RS252-1 | Construction Productivity Program Phase I | 7 |
| RS242-1 | Front End Planning for Renovation and Revamp Projects: An Overview | 7 |
| RS242-1 | Front End Planning for Renovation and Revamp Projects: An Overview | 7 |
| RS160A-1 | Making Zero Accidents A Reality: Focus on Shutdowns, Turnarounds, and Outages | 7 |
| RS183-1 | Design Practices to Facilitate Construction Automation | 7 |
| RS48-1 | Environmental Remediation | 7 |
| RS43-2 | Quantitative Effects of Project Change | 7 |
| RS37-1 | Team Building: Improving Project Performance | 7 |
| RS6-5 | Project Control for Construction | 7 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 7 |
| RS5-3 | Contract Risk Allocation and Cost Effectiveness | 7 |
| RS6-8 | Management of Project Risks and Uncertainties, Version 1.1 | 7 |
| SD-28 | Work Packaging for Project Control | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR213-2 | Front End Planning Toolkit, Version 2.0 | 7 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 7 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 7 |
| IR214-2 | Cost/Schedule Trade-Off Tool | 7 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 7 |
| IR45-2 | A Field Guide to Workers’ Compensation | 7 |
| IR242-2 | Front End Planning of Renovation and Revamp Projects | 7 |
| IR193-2 | Project Manager’s Game Planner for Radical Reduction in Project Cycle Time | 7 |
| IR185-2 | “Look-Up” Table for Crew Scheduling | 7 |
| IR203-2 | Zero Field Rework Self-Assessment Opportunity Checklist | 7 |
| IR165-2 | Owner’s Tool for Project Delivery and Contract Strategy Selection User’s Guide, Second Edition | 7 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 7 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 7 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 7 |
| IR181-2 | International Project Risk Assessment (IPRA) | 7 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 7 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 7 |
| BMM2004-10 | Best Practices for Project Security | 7 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 7 |
| BMM2002-3 | Benchmarking and Metrics Summary Report for 2001 | 7 |
| BMM2001-10 | Impacts of Design/Information Technology on Building and Industrial Projects | 7 |
| BMM2008-2 | 2008 Safety Report | 7 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 7 |
| IR121-2 | Planning for Startup | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-3 | Alignment During Pre-Project Planning: A Key to Project Success, Version 2.1 | 7 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 7 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 7 |
| RS113-1 | Pre-Project Planning Tools: PDRI and Alignment | 7 |
| RR246-11 | Implementing CII Practices The Implementation Planning Model: Steps to Success | 7 |
| RR245-11 | Maximizing Engineering Value | 7 |
| RR47-11 | Improving Industrial Piping Through Vendor Data and Packaged Units Processes | 7 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 7 |
| RS13-1 | Managing Subcontractor Safety | 7 |
| RS123-1 | Modeling the Lessons Learned Process | 7 |
| RS142-1 | Design for Maintainability: Improving Project Return on Investment | 7 |
| RS161-1 | Small Project Execution | 7 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 7 |
| RS15-1 | Emerging Construction Technologies and the Advanced Construction Technology System (ACTS) | 7 |
| RS153-1 | The Field Rework Index: Early Warning for Field Rework and Cost Growth | 7 |
| RS155-1 | Pre-Project Planning Tool: PDRI for Buildings | 7 |
| RS155-1 | Pre-Project Planning Tool: PDRI for Buildings | 7 |
| RS156-1 | Engineering Productivity Measurement | 7 |
| RR181-11 | Development of the International Project Risk Assessment (IPRA) Tool | 7 |
| RR190-11 | The Owner’s Role in Construction Safety | 7 |
| RR171-11 | Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction | 7 |
| RR161-11 | Factors Impacting Small Capital Project Execution | 7 |
| RR210-11 | Contracting to Appropriately Allocate Risk | 7 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 7 |
| RR140-11 | Project-Specific Employee Incentives | 7 |
| RR136-11 | Wireless Communication and Computing at the Construction Jobsite | 7 |
| RR142-12 | State-of-Practice in Maintainability: Seven Case Studies | 7 |
| RR102-11 | The Partnering Process Its Benefits, Implementation and Measurement | 7 |
| RR121-11 | Planning for Startup: Analysis of the Planning Model and Other Success Drivers | 7 |
| RR123-11 | Modeling the Lessons Learned Process | 7 |
| RR114-11 | Innovative Strategies for Contractor Compensation | 7 |
| RR124-11 | Re-Engineering the EPC Process | 7 |
| RR130-11 | PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships | 7 |
| RR130-11 | PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships | 7 |
| RS32-1 | Zero Injury Techniques | 7 |
| RS3-1 | Constructability: A Primer | 7 |
| RS3-1 | Constructability: A Primer | 7 |
| RS210-1 | Equitable Risk Allocation | 7 |
| RS211-1 | Planning A Global Virtual Engineering Team: A Tool for Success | 7 |
| RS213-1 | Front End Planning: Break the Rules, Pay the Price | 7 |
| RS210-1 | Equitable Risk Allocation | 7 |
| RS210-1 | Equitable Risk Allocation | 7 |
| RS2-3 | Productivity Measurement: An Introduction | 7 |
| RS20-2 | An Introduction to Integrated Database Systems | 7 |
| RS181-1 | Risk Assessment on International Projects: A Management Approach | 7 |
| RS184-1 | Introduction to the Value Management Toolkit | 7 |
| RS8-1 | Evaluation of Design Effectiveness | 7 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 7 |
| RS5-1 | Impact of Various Construction Contract Types and Clauses on Project Performance | 7 |
| SD-107 | A Multi-Media Design Aid for Project Hazard Identification & Remediation, Part I | 7 |
| SD-14 | Analysis of Construction Contract Change Clauses, Volume I | 7 |
| SD-102 | Perceptions of Representatives Concerning Project Success and Pre-Project Planning Effort | 7 |
| SD-10 | Determining the Impact of Various Construction Contract Types and Clauses on Project Performance, Vol. I: Analysis & Recommendations | 7 |
| RS8-2 | Input Variables Impacting Design Effectiveness | 7 |
| SD-28 | Work Packaging for Project Control | 7 |
| SD-29 | Costs of Quality Deviations in Design and Construction | 7 |
| SD-20 | Construction Contractor Planning for Fixed-Price Construction | 7 |
| SD-98 | Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis | 7 |
| SP12-2 | Organizing for Project Success | 7 |
| SD-85 | Constructability: Program Assessment and Barriers to Implementation | 7 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 7 |
| SD-75 | Expert Systems Application and Tutorial | 7 |
| SP36-2 | The Blueprint: A Process for Measuring Project Quality | 7 |
| SP39-2 | Pre-Project Planning Handbook | 7 |
| RS184-1 | Introduction to the Value Management Toolkit | 7 |
| RR101-11 | Addressing Construction Worker Safety in the Project Design | 7 |
| RR113-11 | Project Definition Rating Index (PDRI) | 7 |
| IR215-2 | VOW: Voice of the Craft Worker Tool, Second Edition | 7 |
| IR220-2 | Project Health Indicator (PHI) Tool: Assessing Project Health during Project Execution | 7 |
| IR241-2 | Construction Input Assessment Tool, Version 1.1 | 7 |
| IR210-2 | Equitable Risk Allocation: Two-Party Risk Assessment and Allocation Model | 7 |
| IR204-2 | Project Priority Calculator | 7 |
| IR166-3 | CII Best Practices Guide: Improving Project Performance, Second Edition | 7 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 7 |
| IR171-2 | Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR113-2 | PDRI: Project Definition Rating Index Industrial Projects, Version 3.2 | 7 |
| IR BMM-2 | Benchmarking & Metrics Implementation Toolkit Pocket Guide | 7 |
| CII-25 | Building On 25 Years | 7 |
| IR101-2 | Design for Construction Safety Toolbox, Version 2.0 | 7 |
| BMM2006-2 | 2006 Safety Report | 7 |
| BMM2003-4 | Benchmarking and Metrics Value of Best Practices Report | 7 |
| BMM2002-10 | Measuring the Impacts of the Delivery System on Project Performance Design-Build and Design-Bid-Build | 7 |
| IR140-2 | Employee-Based Project Incentives Toolkit | 7 |
| IR121-2 | Planning for Startup | 7 |
| IR163-2 | Onsite Design Tool for Project Planning, Second Edition | 7 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 7 |
| IR155-2 | PDRI: Project Definition Rating Index Building Projects, Version 3.2 | 7 |
| RR204-11 | The Owner’s Role in Project Success | 7 |
| RR184-11 | Development of the Value Management Toolkit | 7 |
| RR191-11 | Application of Lean Manufacturing Principles to Construction | 7 |
| RR183-11 | Design Practices to Facilitate Construction Automation | 7 |
| RR230-11 | An Analysis of Lessons Learned Programs in the Construction Industry, Second Edition | 7 |
| RR246-11 | Implementing CII Practices The Implementation Planning Model: Steps to Success | 7 |
| RR213-11 | Data Analysis in Support of Front End Planning Implementation | 7 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 7 |
| RR220-11 | Forecasting Potential Risks Through Leading Indicators to Project Outcome | 7 |
| RR216-11 | Target Safety: Programs Focused on Preventing Specific Hazards | 7 |
| RS161-1 | Small Project Execution | 7 |
| RS163-1 | Onsite Design: When and How Much? | 7 |
| RS114-1 | Innovative Contractor Compensation | 7 |
| RS12-1 | Project Objective Setting, Second Edition | 7 |
| RR47-12 | Enhancement of the Piping and Instrumentation Diagram Development Process | 7 |
| RS10-1 | Costs of Quality Deviations in Design and Construction | 7 |
| RR246-11 | Implementing CII Practices The Implementation Planning Model: Steps to Success | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP39-2 | Pre-Project Planning Handbook | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP34-1 | Constructability Implementation Guide, Second Edition | 7 |
| SP32-2 | Zero Injury Economics | 7 |
| SD-9 | Contract Clause Study Data | 7 |
| SD-86 | Zero Accident Techniques | 7 |
| SD-94 | Modeling Pre-Project Planning for the Construction of Capital Facilities | 7 |
| SP14-1 | Construction Work Force Recruitment Resources Guide | 7 |
| RS6-5 | Project Control for Construction | 7 |
| SD-105 | Analysis of Pre-Project Planning Effort and Success Variables for Capital Facility Projects | 7 |
| SD-79 | Quality Performance Measurements of the EPC Process: Current Practices | 7 |
| SD-67 | Indirect Costs of Construction Accidents | 7 |
| SD-85 | Constructability: Program Assessment and Barriers to Implementation | 7 |
| SD-82 | Project-Level Model and Approaches to Implement Constructability | 7 |
| SD-26 | Input Variables Impacting Design Effectiveness | 7 |
| SD-29 | Costs of Quality Deviations in Design and Construction | 7 |
| SD-4 | Constructability Improvement During Conceptual Planning | 7 |
| SD-4 | Constructability Improvement During Conceptual Planning | 7 |
| RS34-2 | Preview of Constructability Implementation | 7 |
| RS39-1 | Pre-Project Planning: Beginning a Project the Right Way | 7 |
| RS3-1 | Constructability: A Primer | 7 |
| RS6-10 | The Impact of Changes on Construction Cost and Schedule | 7 |
| RS204-1 | The Owner’s Role in Project Success | 7 |
| RS193-1 | Techniques for Radical Reduction in Project Cycle Time | 7 |
| RS2-1 | Construction Industry Institute Model Plant | 7 |
| RS102-1 | Model for Partnering Excellence | 6 |
| RS106-1 | 3D CAD Link | 6 |
| RS105-1 | Compass: An Assessment Tool for Improving Project Team Communications | 6 |
| RS130-1 | Reforming Owner, Contractor, Supplier Relationships: A Project Delivery System to Optimize S |